This paper analyzes energy-efficient protocols for wireless sensor networks (WSNs), focusing on the LEACH protocol for clustering. The simulation results indicate that an improved version of LEACH outperforms the original in terms of energy consumption and overall throughput. The study highlights the significance of clustering in reducing energy expenditure within WSNs.