BP103 jQuery - The world's most popular JavaScript library comes to XPages Dr. Mark Roden Senior Consultant, PSC Group LLC © 2013 IBM Corporation
About Marky  Over 15 years IBM Notes Domino® work  Senior Consultant at PSC Group • XPages Developer • Project Leader • jQuery Specialist  Contact Information – Blog: http://www.xomino.com – Email: mroden@psclistens.com www.psclistens.com @pscgroup – Twitter: @markyroden – Skype: marky.roden
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
What is jQuery anyway?  A JavaScript library which simplifies the common every day web development tasks of Document Model manipulation, event handling, animation and AJAX/JSON Created: June 2006 by John Resig Removes browser dependencies Open Source (MIT License)
What is jQuery anyway?  60% of world‟s top 10,000 websites use jQuery http://trends.builtwith.com/javascript (*Dec 2012) Used by Microsoft .Net v4 as part of the ASP.NET AJAX framework Some websites you probably know using jQuery Amazon Google Twitter Dell Wordpress Bank of America Stackoverflow Drupal BestBuy Wordpress
What is jQuery anyway?  Core – Document Model (DOM) Manipulation – Simple Animations  UI – Pre-packages functional capabilities – Analogous to Dojo Widgets  Mobile – A unified, HTML5-based user interface system for all popular mobile device platforms, built on the rock-solid jQuery and jQuery UI foundation.
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
What about Dojo? When should I use jQuery?  Dojo and jQuery have the same basic premise: – Browser compatibility / Code simplification  Many similar capabilities. – DOM manipulation – Widgets (Date pickers, sliders etc)  Many differences – Dojo intended for larger client applications – jQuery intended to make coding as easy as possible
Where‟s the balance?  Many factors determine the balance – Network connectivity – Functional requirements – Developmental experience with Dojo/jQuery – Project timeline – Maintainability of the application – jQuery v2.0 (future) will not support IE<9 • “The entire jQuery core team instantly became giddy as they started ripping out oldIE support for jQuery 2.0.” 17 Dec 2012 - Scott González (jQuery contributor)
Don‟t use jQuery when….  There isn‟t a justifiable reason to use it  jQuery is an additional download (~94k) – Version 1.8 does allow for exclusion of code which is not necessary  When not to use jQuery : – Simple DOM manipulation – To provide functionality which is already provided by Dojo Widgets – To determine runtime events in the onLoad event – If you are using OneUI (*not for beginners) – Because you don‟t want to learn Dojo
Use jQuery when……  Enhanced functionality not provided by Dojo – Specific jQuery or jQuery UI functionality – Specific Animation requirements – Broader browser compatibility  The business plan supports jQuery usage  The requirements are best suited to a jQuery solution >>>>> The Plugin Community <<<<
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
How does jQuery work - API References API references Examples Selectors (“ELEMENT”) (“.class”) (“#idTag”) Attributes .attr() .html() .toggleClass() Traversing .children() .closest() .find() Manipulation .appendTo() .css() .val() CSS .height() .position() .width() Events .blur() .bind() .keypress() Effects .animate() .fadeIn() .slideToggle() Ajax .get() .getJSON() .serialize() Utilities .grep() .each() .inArray() Internals .error() .pushStack() .context() Example API reference methods and properties http://api.jquery.com
Select and conquer 1) Select the DOM elements you wish to affect $(„.myClass‟) Select all elements with a class “myClass” 2) Concatenate the API reference to use $(„.myClass‟).css(„display‟, „none‟) Set the display style to none 3) Execute
Chaining  All methods/properties return a jQuery object – Allows for chaining of *all* other API references $("p") Select All Paragraph nodes Within each node find all words containing .find(":contains('t')") the letter t .css('color','red') Color those matches red  Advantages – Object reuse: Lower memory consumption and faster – Shorter more manageable code – Easier syntax for beginners – Easy plugin creation
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
Adding jQuery to the application  jQuery is a Client Side JavaScript library – Can be added to the application – Can be referenced externally to the database  jQuery plugins contain images and style sheets – A complete miniaturized application – More than just JavaScript Code – Could be complicated to maintain if all files were added as resources
Adding jQuery to the database Download the jQuery library – http://jquery.com – Save in a “js” folder on your computer
Adding jQuery to the database  Don‟t add it to the database as a file resource  Don‟t add it to the database as a js library  Domino Designer in Eclipse (DDE) reads and processes resources – More time consuming (slows DDE)  Less maintainable
Adding jQuery to the database  The WebContent folder – Acts like the root folder within your database – All files referenced to the .nsf/ in the URL – Much easier to maintain files in one place – Makes jQuery plugin management much easier
Adding jQuery to the database  Drag and Drop the js folder into WebContent
Adding jQuery to the application  Directly added to the XPage source panel <script type="text/javascript" src="js/jquery-1.8.3.min.js"></script>
Adding jQuery to the application  Through a Theme <resource> <content-type>application/x-javascript</content-type> <href>js/jquery-1.8.3.min.js</href> </resource>
Adding jQuery to your XPages - Example  Modernizing a notes view
Adding User interactivity  Add a basic viewPanel control to your XPage An un-styled viewPanel Functional but not aesthetically pleasing
Adding User interactivity - demonstration  Using jQuery, user interactivity can be added to a viewPanel to make it more functional and improve the user experience. The following link has an example of the demonstration http://bit.ly/MarkyIC13Demo
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
jQuery plugins  Extensions of the jQuery API code base  The plugin is called in the same was as a normal API reference  $(„.myClass‟).doSomething()  To achieve the desired functionality additional resources are often necessary – CSS – Images – Other JavaScript files
jQuery plugins  Additional JavaScript Libraries – May also include • Images • CSS – Added to your XPage database through WebContent folder as before
jQuery plugins - example  Joyride.js – Website feature tour – Requirement: • Provide a visual cue for website users to the new features available • Make it simple to use • Make it one time only 31
jQuery plugins - example  Joyride – Website feature tour By clicking a button users are guided around the new website 32
jQuery plugins - example  Joyride – Website feature tour All the properties available with the Joyride plugin 33
jQuery plugins  For more information on how to add a jQuery plugin to your database:  Notes in 9 Episode 74 – Getting started with jQuery Plugins in XPages http://bit.ly/Nin9Ep74
Agenda  What is jQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
Functionality in a box  Yesterday your boss could have said: –“I need a slideshow adding to the website by tomorrow, needs to allow users to see thumbnails and cycle through them quickly…..”  You would have panicked  You could have remembered Google is your friend.. and found a great reference on jQuery slideshows  http://speckyboy.com/2009/06/03/15-amazing-jquery- image-galleryslideshow-plugins-and-tutorials/  You would then have responded: “Which one sir?” 
Functionality in a box  Over 3000 jQuery plugins created and registered Charting Modal Window Form Validation Mobile Responsive Layouts Web Typography Sliders Animation Galleries Tables Carousels Form Select and Combo Time and Date Pickers And almost all of them are FREE
Demonstrations  Demonstrations of jQuery plugins in XPages can be found at: http://www.xomino.com/IBMConnect13Demo http://demo.xomino.com
 Questions and Answers http://www.xomino.com http://demo.xomino.com twitter: @MarkyRoden  Please don‟t forget to do your evaluations
Legal disclaimer © IBM Corporation 2013. All Rights Reserved. The information contained in this publication is provided for informational purposes only. While efforts were made to verify the completeness and accuracy of the information contained in this publication, it is provided AS IS without warranty of any kind, express or implied. In addition, this information is based on IBM‟s current product plans and strategy, which are subject to change by IBM without notice. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this publication or any other materials. Nothing contained in this publication is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in this presentation may change at any time at IBM‟s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results. 40 © 2013 IBM Corporation
Extra Slides
Resources  www.jquery.com Download the latest version Review the documentation Look through the Tutorials www.jqueryui.com Fantastic working examples/code Themebuilder www.jquerymobile.com Documentation Example code Example builder www.stackoverflow.com (*Jan 2013) ~267,000 questions/answers tagged jQuery ! (~4,300 questions tagged Dojo) (~950 questions tagged XPages)

jQuery - the world's most popular java script library comes to XPages

  • 1.
    BP103 jQuery -The world's most popular JavaScript library comes to XPages Dr. Mark Roden Senior Consultant, PSC Group LLC © 2013 IBM Corporation
  • 2.
    About Marky  Over15 years IBM Notes Domino® work  Senior Consultant at PSC Group • XPages Developer • Project Leader • jQuery Specialist  Contact Information – Blog: http://www.xomino.com – Email: mroden@psclistens.com www.psclistens.com @pscgroup – Twitter: @markyroden – Skype: marky.roden
  • 3.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 4.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 5.
    What is jQueryanyway?  A JavaScript library which simplifies the common every day web development tasks of Document Model manipulation, event handling, animation and AJAX/JSON Created: June 2006 by John Resig Removes browser dependencies Open Source (MIT License)
  • 6.
    What is jQueryanyway?  60% of world‟s top 10,000 websites use jQuery http://trends.builtwith.com/javascript (*Dec 2012) Used by Microsoft .Net v4 as part of the ASP.NET AJAX framework Some websites you probably know using jQuery Amazon Google Twitter Dell Wordpress Bank of America Stackoverflow Drupal BestBuy Wordpress
  • 7.
    What is jQueryanyway?  Core – Document Model (DOM) Manipulation – Simple Animations  UI – Pre-packages functional capabilities – Analogous to Dojo Widgets  Mobile – A unified, HTML5-based user interface system for all popular mobile device platforms, built on the rock-solid jQuery and jQuery UI foundation.
  • 8.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 9.
    What about Dojo?When should I use jQuery?  Dojo and jQuery have the same basic premise: – Browser compatibility / Code simplification  Many similar capabilities. – DOM manipulation – Widgets (Date pickers, sliders etc)  Many differences – Dojo intended for larger client applications – jQuery intended to make coding as easy as possible
  • 10.
    Where‟s the balance? Many factors determine the balance – Network connectivity – Functional requirements – Developmental experience with Dojo/jQuery – Project timeline – Maintainability of the application – jQuery v2.0 (future) will not support IE<9 • “The entire jQuery core team instantly became giddy as they started ripping out oldIE support for jQuery 2.0.” 17 Dec 2012 - Scott González (jQuery contributor)
  • 11.
    Don‟t use jQuerywhen….  There isn‟t a justifiable reason to use it  jQuery is an additional download (~94k) – Version 1.8 does allow for exclusion of code which is not necessary  When not to use jQuery : – Simple DOM manipulation – To provide functionality which is already provided by Dojo Widgets – To determine runtime events in the onLoad event – If you are using OneUI (*not for beginners) – Because you don‟t want to learn Dojo
  • 12.
    Use jQuery when…… Enhanced functionality not provided by Dojo – Specific jQuery or jQuery UI functionality – Specific Animation requirements – Broader browser compatibility  The business plan supports jQuery usage  The requirements are best suited to a jQuery solution >>>>> The Plugin Community <<<<
  • 13.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 14.
    How does jQuerywork - API References API references Examples Selectors (“ELEMENT”) (“.class”) (“#idTag”) Attributes .attr() .html() .toggleClass() Traversing .children() .closest() .find() Manipulation .appendTo() .css() .val() CSS .height() .position() .width() Events .blur() .bind() .keypress() Effects .animate() .fadeIn() .slideToggle() Ajax .get() .getJSON() .serialize() Utilities .grep() .each() .inArray() Internals .error() .pushStack() .context() Example API reference methods and properties http://api.jquery.com
  • 15.
    Select and conquer 1)Select the DOM elements you wish to affect $(„.myClass‟) Select all elements with a class “myClass” 2) Concatenate the API reference to use $(„.myClass‟).css(„display‟, „none‟) Set the display style to none 3) Execute
  • 16.
    Chaining  All methods/propertiesreturn a jQuery object – Allows for chaining of *all* other API references $("p") Select All Paragraph nodes Within each node find all words containing .find(":contains('t')") the letter t .css('color','red') Color those matches red  Advantages – Object reuse: Lower memory consumption and faster – Shorter more manageable code – Easier syntax for beginners – Easy plugin creation
  • 17.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 18.
    Adding jQuery tothe application  jQuery is a Client Side JavaScript library – Can be added to the application – Can be referenced externally to the database  jQuery plugins contain images and style sheets – A complete miniaturized application – More than just JavaScript Code – Could be complicated to maintain if all files were added as resources
  • 19.
    Adding jQuery tothe database Download the jQuery library – http://jquery.com – Save in a “js” folder on your computer
  • 20.
    Adding jQuery tothe database  Don‟t add it to the database as a file resource  Don‟t add it to the database as a js library  Domino Designer in Eclipse (DDE) reads and processes resources – More time consuming (slows DDE)  Less maintainable
  • 21.
    Adding jQuery tothe database  The WebContent folder – Acts like the root folder within your database – All files referenced to the .nsf/ in the URL – Much easier to maintain files in one place – Makes jQuery plugin management much easier
  • 22.
    Adding jQuery tothe database  Drag and Drop the js folder into WebContent
  • 23.
    Adding jQuery tothe application  Directly added to the XPage source panel <script type="text/javascript" src="js/jquery-1.8.3.min.js"></script>
  • 24.
    Adding jQuery tothe application  Through a Theme <resource> <content-type>application/x-javascript</content-type> <href>js/jquery-1.8.3.min.js</href> </resource>
  • 25.
    Adding jQuery toyour XPages - Example  Modernizing a notes view
  • 26.
    Adding User interactivity Add a basic viewPanel control to your XPage An un-styled viewPanel Functional but not aesthetically pleasing
  • 27.
    Adding User interactivity- demonstration  Using jQuery, user interactivity can be added to a viewPanel to make it more functional and improve the user experience. The following link has an example of the demonstration http://bit.ly/MarkyIC13Demo
  • 28.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 29.
    jQuery plugins  Extensionsof the jQuery API code base  The plugin is called in the same was as a normal API reference  $(„.myClass‟).doSomething()  To achieve the desired functionality additional resources are often necessary – CSS – Images – Other JavaScript files
  • 30.
    jQuery plugins  AdditionalJavaScript Libraries – May also include • Images • CSS – Added to your XPage database through WebContent folder as before
  • 31.
    jQuery plugins -example  Joyride.js – Website feature tour – Requirement: • Provide a visual cue for website users to the new features available • Make it simple to use • Make it one time only 31
  • 32.
    jQuery plugins -example  Joyride – Website feature tour By clicking a button users are guided around the new website 32
  • 33.
    jQuery plugins -example  Joyride – Website feature tour All the properties available with the Joyride plugin 33
  • 34.
    jQuery plugins  Formore information on how to add a jQuery plugin to your database:  Notes in 9 Episode 74 – Getting started with jQuery Plugins in XPages http://bit.ly/Nin9Ep74
  • 35.
    Agenda  What isjQuery?  What about Dojo? When should I use jQuery?  How does jQuery work?  How do I add jQuery to my XPages?  What are jQuery plugins?  How can jQuery plugins solve my requirements
  • 36.
    Functionality in abox  Yesterday your boss could have said: –“I need a slideshow adding to the website by tomorrow, needs to allow users to see thumbnails and cycle through them quickly…..”  You would have panicked  You could have remembered Google is your friend.. and found a great reference on jQuery slideshows  http://speckyboy.com/2009/06/03/15-amazing-jquery- image-galleryslideshow-plugins-and-tutorials/  You would then have responded: “Which one sir?” 
  • 37.
    Functionality in abox  Over 3000 jQuery plugins created and registered Charting Modal Window Form Validation Mobile Responsive Layouts Web Typography Sliders Animation Galleries Tables Carousels Form Select and Combo Time and Date Pickers And almost all of them are FREE
  • 38.
    Demonstrations  Demonstrations ofjQuery plugins in XPages can be found at: http://www.xomino.com/IBMConnect13Demo http://demo.xomino.com
  • 39.
     Questions andAnswers http://www.xomino.com http://demo.xomino.com twitter: @MarkyRoden  Please don‟t forget to do your evaluations
  • 40.
    Legal disclaimer © IBM Corporation 2013. All Rights Reserved. The information contained in this publication is provided for informational purposes only. While efforts were made to verify the completeness and accuracy of the information contained in this publication, it is provided AS IS without warranty of any kind, express or implied. In addition, this information is based on IBM‟s current product plans and strategy, which are subject to change by IBM without notice. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this publication or any other materials. Nothing contained in this publication is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in this presentation may change at any time at IBM‟s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results. 40 © 2013 IBM Corporation
  • 42.
  • 43.
    Resources  www.jquery.com Download the latest version Review the documentation Look through the Tutorials www.jqueryui.com Fantastic working examples/code Themebuilder www.jquerymobile.com Documentation Example code Example builder www.stackoverflow.com (*Jan 2013) ~267,000 questions/answers tagged jQuery ! (~4,300 questions tagged Dojo) (~950 questions tagged XPages)