Analyzing Systems Using Data Flow Diagrams Chapter 9 Analyzing Systems Using Data Flow Diagrams Key Points and Objectives 1. Data flow diagrams (DFDs) are one of the main methods available for analyzing data–oriented systems. 2. Through the use of (DFDs), which emphasize the logic underlying the system, the systems analysts can put together a graphical representation of data movement through the organization. 3. The data flow approach has four main advantages over the narrative explanation of the data movement. They are: A. Freedom from committing to the technical implementation of the system too early B. B. Further understanding of the interrelationships of systems and subsystems C. C. Communicating current system knowledge to users through data flow ... Show more content on Helpwriting.net ... Better communication with users. They are familiar with how the business operates. B. More stable systems, since the design is based on a business framework. C. Increased understanding of the business by analysts. D. The system will have increased flexibility and be easier to maintain. E. Elimination of redundancy. 15. Physical data flow diagrams show how the system operates or how the new system will be implemented. Physical data flow diagrams include: A. Clarifying which processes are manual and which are automated. B. Describing processes in greater detail. C. Sequencing processes in the order they must be executed. D. Temporary data stores and transaction files. E. Specifying actual document and file names. F. Controls to ensure accuracy and completeness. 16. Physical data flow diagrams include processes for adding, reading, changing, and deleting records. CRUD is an acronym for Create, Read, Update, Delete. 17. A CRUD matrix shows which programs or processes add, read, update or delete master file records. 18. Master or transaction files are used to link all processes that operate at different times. 19. An input flow from an external entity is sometimes called a trigger, since it starts activities. 20. Elements (or fields) are categorized as either: A. Base elements, that are keyed into the system. B. Derived elements, which are the result of some operation, such as arithmetic or logic. 21. Another approach used to ... Get more on HelpWriting.net ...
P1 : Outline The Principles Of Systems Analysis Contents P1 – Outline the principles of systems analysis 2 P2 – Illustrate the stages of a development life cycle 3 P3 – Explain the benefits of structured analysis 4 M1 – Discuss the most appropriate uses of different development lifecycle models 5 P1 – Outline the principles of systems analysis System Analysis is the study where detailed information about the components and requirements of a system, the information needs of an organisation, the characteristics and current components of the systems and the user functional requirements of the systems that is proposed system. The Waterfall life cycle model The waterfall lifecycle was the first process model to be introduced and widely known. It is also known as the linear–sequential ... Show more content on Helpwriting.net ... An Example of entities in retail context could be Item ID, Colour, Size and Price. Data Flow Modelling – This is the process of modelling and recording how data flows around a system. A Data Flow Model is made up of connected Data Flow Diagrams (DFD) which are supported by appropriate documentation. DFDs represent the processes and functions within a system (activates that transform data from one form to another), data stores (file storage, external entities (things that send data into a system or receive data from a system) and finally data flows (show the flow of data around the system). Entity Event Modelling – This is the process of identifying, displaying and documenting the business events that affect each entity and the sequence in which these events occur. An Entity/Event Model is made up of a set of Entity Life Histories (one for each entity) and appropriate supporting documentation. Key drivers for staring a new project: Given that the development of new systems can be fraught with problems and delays, there are many factors that drive organisations to develop new systems. The most important drives come directly from the companies needs and are often not related to technology, but however to technological solutions, these include: A need to reduce staff costs – having a new system that can carry out the same job as employees has become a popular drive for a new system in an organisation, which ... Get more on HelpWriting.net ...
Hotel Management System CONTENTS 1. INRODUCTION Page No. An Overview Mission of the Project Background Study The Organization Profile Study on Existing System 2. SYSTEM ANALYSIS Study on Proposed System Defining the problem Developing Solution Strategies User Requirement Specification Software Requirement Specification System Specification Application Specification Hardware Specification Software Specification Network Specification Cost Estimation and Scheduling Final ... Show more content on Helpwriting.net ... N Solutions software development services cover the complete project life cycle, from requirement assessment and task definition, to solution development, to implementation and integration, followed by support and maintenance. The ability to integrate software with existing systems by expanding information systems infrastructure is an important advantage of N Solutions as a turn– key solution provider. N Solutions expertise covers the following areas: Enterprise Application Integration; Data Warehousing and Decision Support; Electronic Document Management; Information Security; Internet/Intranet and e–Commerce solutions. Excellent quality of N Solutions software development is guaranteed by their team of professionals with certified skills and experienced project managers. N Solutions also ensures quality control at all stages of development process. Transparent software development process and interaction with the customer are taken utmost care at N Solutions. They give their clients a real commercial advantage by the professionalism, flexibility and specialist knowledge 1.3.2. Study on Existing System EXISTING SYSTEM Hotel Management involves maintaining various operations of the hotel like Booking or reservations of the rooms, Cancellation of the ... Get more on HelpWriting.net ...
Designing A Model Using Structured Analysis Techniques At the conclusion of the requirements phase, the team has agreed upon the needs of the business and what must be required of the new system. The next step in designing and implementing the new system is determining the processes that will be applied to the data and graphically representing them in a model using structured analysis techniques. Process models are used to identify and document the portion of system requirements that relates to data. Processes are the logical rules that are applied to transform the data into meaningful information. During this phase, data flow diagrams are required to show how the data will move through the system. The systems data flow and data stores are then documented in the data dictionary, which is used ... Show more content on Helpwriting.net ... An entity relationship diagram visually describes the objects of the data and their relationship to one another. Business process diagrams show how data moves through the organization using processes performed by an individual. Managers, developers, and users then review and approve the diagrams and documentation generated before proceeding to the next modeling phase. With the completion of the logical model, a physical model is outlined to portray the actual design of a database. Physical modeling illustrates the integration of the data requirements that were recognized during logical modeling into a system structure that will be implemented. A physical model creates objects using symbols such as tables and columns based on entities and attributes that were defined during logical modeling. Constraints, such as primary keys, foreign keys and other unique keys, are defined in this modeling phase. It is crucial to have a well–informed, knowledgeable design team in the development of the physical model. "To ensure that all information system needs are met, physical models are often developed jointly by a team representing the data administration, database administration, and application development areas" (CA ERwin Data Modeler Methods Guide – CA, n.d.). Physical modeling is database specific, which means the objects defined during physical modeling can vary depending on the database software being used. The hardware of a company ... Get more on HelpWriting.net ...
Overview of System Development Life Cycle (SDLC) System development life cycle is a process use for the period of development system. SDLC contains four main steps those are analysis, planning, design and implementation during the analysis steps of dataflow diagram used to process the model of a system. A consistency of the context diagram to lower dataflow diagram is very important for easy process model of a system, manual consistency check from context to lower level data flow diagram using a checklist is time intense process SDLC is methodology utilization throughout the improvement of programming framework beginning from arranging until the execution stage. Information stream outlining, on the other hand, is utilized to prepare the procedure model throughout the examination stage [12]. Procedure model is exceptionally imperative in characterizing the prerequisites in a graphical perspective. Accordingly, the unwavering quality of the methodology model is the key component to enhance the execution of the accompanying stages in SDLC. SDLC is likewise used to see on how an data framework can help business necessities, outlining the framework, fabricating the framework and conveying the framework to clients [12]. SDLC comprises of four principal stages, which are examination, outline, execute and testing stages. In the examination stage, prerequisites of a framework are distinguished and refined into a procedure model. Procedure model could be utilized to speak to the methodologies or exercises that are ... Get more on HelpWriting.net ...
Systems Analysis And Role Of The Systems Analyst Assignment 1 – Task 1 (P1) (P1 – 1) An explanation of what Systems Analysis is and the role of the Systems Analyst. Discuss Systems Analysis and the role of the Systems Analyst A system analyst is an important part of a business, who is usually an IT professional, specializing in analyzing, designing and implementing information systems. The primary role of a system analyst is to assess situations, and the suitability of information systems, and then study the problems and improvements needed within a certain organisation and come up with a way that these changes can be made effectively. It is the role of the system analyst to research problems, plan solutions, recommend software/systems and to overall co–ordinate the development of the ... Show more content on Helpwriting.net ... The system analyst will then examine the project thoroughly and go through any potential faults they think will cause a major issue for the company, and make plans to solve them as quickly and effectively as possible. The primary purpose of the system analyst at this stage is to gather information as much information as possible and determine any specific requirements needed for e.g. software, which will be specified in the requirements specification. The end product of the system analyst stage is known as the deliverable – which will be the end set of requirements that the analyst has chosen for the project. A system analyst can have the following duties: Interacting with any internal users/customers in order to learn and document any requirements Write up any specified technical requirements. Give presentations about their findings to clients and colleagues Interact with designers in order to understand software limitations. Help the programmers during system development Perform the system testing. Deploy the completed system. Document the system development & contribute to user manuals and training. (P1 – 2) A discussion of the reasons why an organisation might initiate a Systems Analysis project... TELOS. Discuss the reasons why an organisation might initiate a Systems Analysis project To improve efficiency Improve ease of use Make use of new technology ... Get more on HelpWriting.net ...
Cooks Emporium Is A Small Retail Business Operating Out Essay Cooks Emporium is a small retail business operating out of Main Street in Downtown Ames. It has been in operation for around 30 years, and serves the Ames community with quality and creative kitchenware to suit every need. Because of its roots in community oriented cooking, it also operates cooking classes open to the public so that everyone can share in the delicious knowledge that has been accumulated through decades of cooking through its members. Even though Cooks Emporium has been in business for a few decades amongst massive technological changes, it has managed to attempt the use of information systems to suit its needs. However, because the operation is small and has a simple but main mission to spread the joy of cooking, the owners and employees have not been able to efficiently utilize the proper information systems to ensure smooth operation of the business. On a high level, the main information system within Cooks Emporium can be divided up into the different functional areas that all come together to assure that the business can fully operate. Cooks Emporium employs the use of accounting systems (Mainly outsourced), communication systems, payment processing systems, and also inventory management information systems. All of these functional areas come together to form the main connected information system (As represented in the Context Diagram). Inevitably, when one area of the information system starts to fail with what it can offer, it can start to ... Get more on HelpWriting.net ...
Essay Inventory Control Automated Office System (Icaos) Inventory Control Automated Office System David Pierce Individual Project IS316 – Systems Analysis and Design Professor: Erlan Burk Park University Fall II 2010 Table of Contents System Description 2–3 Functional Description 4–5 Data Dictionary 6–8 Context Level Diagram and Child Diagram 9–12 System Input, Output Forms, and Interfaces 13–14 Testing, Maintenance and Auditing 15 System Description System Name Inventory Control Automated Office System (ICAOS) Type of System ICAOS is an Automated Office System using an Oracle Database and front end application. The ICAOS will coincide with the current timekeeping ... Show more content on Helpwriting.net ... System Boundaries The ICAOS will be on a dedicated server, and the input functions will be accessed by warehouse personnel and management. The reporting and tracking functions will be accessed by supervisors and management only via a pass code. External Interfaces The ICAOS will interface with the current online ordering system, and will generate orders within the system. Once the order is downloaded into the system, it can be accessed by management or supervisors, and scanned for input by employees. The bills of lading also function the same way on the receiving end. The current ordering system allows vendors to send shipment contents electronically, and they can be accessed for input by employees by scanning the bill of lading. Internal Interfaces The ICAOS will also interface with the current KRONOS time keeping system. This will allow for efficiency tracking and report generation that can tell the number of items received, moved, or shipped per hour by employee. System Relationship With Organizational Mission The warehouse mission is to provide the right product at the right time at the right price. This system will allow the managers and supervisors to not only ensure that each and every employee is dedicated to that mission, but it will allow them to track the products in inventory, and forecast needs more accurately, so as to provide the customer with excellent ... Get more on HelpWriting.net ...
Systems Development and Documentation Techniques CHAPTER 3 SYSTEMS DEVELOPMENT AND DOCUMENTATION TECHNIQUES SUGGESTED ANSWERS TO DISCUSSION QUESTIONS 3.1 Identify the DFD elements in the following narrative: A customer purchases a few items from a local grocery store. Jill, a salesclerk, enters the transaction in the cash register and takes the customer's money. At closing, Jill gives both the cash and the register tape to her manager. Data Flows: merchandise, payment, cash and register tape Data Source: customer Processes: capture sales and payment data and collect payment, give cash and register tape to manager Storage: sales file (register tape), cash register 3.2 Do you agree with the following statement: "Any one of the systems documentation procedures can be used to ... Show more content on Helpwriting.net ... converting source documents to magnetic tape using a computer–based optical character reader (OCR) d. processing OCR documents online to update a database on magnetic disk 3.1 (continued) Assorted Flowcharting Segments e. reading data from a magnetic disk into the computer to be printed on a report f. using a computer or terminal to </inst>key data from source documents to a file stored on a magnetic disk g. manually sorting and filing invoices numerically 3.1 (continued) Assorted Flowcharting Segments h. using a terminal to enter source document data and send it to a </inst>remote location where an online processing system records it in a database stored on magnetic disk i. a scheduled automatic backup of an internal hard drive to an external hard drive j. using a terminal to </inst>query customer sales data maintained on a magnetic disk 3.1 (continued) Assorted Flowcharting Segments k. enter employee hours recorded on time cards in the payroll transaction file maintained on disk and update wage data maintained on the payroll master file 3.1 (continued) Assorted Flowcharting Segments l. use a terminal to </inst>access a price list maintained on disk to complete a purchase order. An electronic copy of the purchase order is sent to ... Get more on HelpWriting.net ...
System Analysis and Design System Analysis and Design Syllabus SYSTEM ANALYSIS AND DESIGN Module 1: Data and Information (3) Types of information: operational, tactical, strategic and statutory – why do we need information systems – management structure – requirements of information at different levels of management – functional allocation of management – requirements of information for various functions – qualities of information – small case study. Module 2: Systems Analysis and Design Life Cycle (3) Requirements determination – requirements specifications – feasibility analysis – final specifications – hardware and software study – system design – system implementation – system evaluation – system modification. Role of systems analyst – attributes of a ... Show more content on Helpwriting.net ... 2. 1 3 1 3. 2. Systems Analysis and Design Life Cycle 4. 5. 0.5 1 3 1 3. Information gathering 4. Feasibility analysis 6. Feasibility analysis, final specifications, hardware and software study, system design, system implementation, system evaluation, system modification. 7. Role of systems analyst – attributes of a systems analyst – tools used in system analysis 8. Information gathering, strategies, methods 9. Case study/documenting study, system requirements specification, from narratives of requirements to classification of requirements as strategic, tactical, operational and statutory. Example case study 10. How to formulate project goals and quantify them 11. Examining alternative solutions and evaluating proposed solutions a) Technical feasibility b) Operational feasibility c) Economic
feasibility 12. Cost benefit analysis, Documenting feasibility report 13. Developing Data Flow Diagrams (DFD) a) What are DFDs? b) Symbols used in DFD c) Rules of data flow d) Good style ... Get more on HelpWriting.net ...
IT Solutions Essay 1. Identify suitable business data, data elements, data types, and resources, based on the following interview between a database analyst and a lecturer from Sutherland University: Business Data Data Elements Data Types Resources Course Course code Course name Course start date Course end date Integer Character Date Date Admin Classes Class name Start date End date Time Location Class capacity Integer Date Date Date time Integer Variable Admin Students Student ID Student name Grade Integer Character Variable Admin 2. a. Describe the characteristic of second normal form in a normalization process A relation is said to be in Second Normal Form (2NF) if and only if it is already in first normal ... Show more content on Helpwriting.net ... Case study: Easy Drive Easy Drive is a car rental company that offers the best car hire prices in Australia. The company is located in Sydney, Melbourne, and Brisbane. Easy Drive branches could be found at all major airports and in downtown locations. In addition, online car reservation system is also provided for the ease of the booking experience. Easy Drive is not only providing affordable prices, but also providing the best car rental experience. The company is well known for its excellent customer service. Moreover, Easy Drive has more than 12,000 vehicles that range from car, van, and busses. The company's goal is to keep increasing their service offering but partnering with various service providers. Due to the growth and expansion of the company, Easy Drive currently is in deep need of renewing its database system. Easy Drive has trusted WIC to model its data objects and to provide the company with a documentation of its business data model. It is vital for easy drive to have an accurate and reliable data, across all of its business processes in order to provide an excellent car rental experience to its customers. Thus, a detail list of business data and normalisation procedure is required to model the company's data. Interview ... Get more on HelpWriting.net ...
Ziggy's Suit Department Systems Analysis & Design Ziggy's Suit Department Systems Analysis & Design Zachary Powe ITM 6000–Final Project Mrs. Constance Jolly March 8, 2012 TABLE OF CONTENTS Business: 4 Organizational Chart: 5 Preliminary Investigation: 5 Project Definition Document 6 Problem Statement: 6 Project: 7 Mandatory Objectives: 7 Desirable Objectives: 7 Priority of Project: 7 Project Scope: 7 Terms of Reference: 8 Time/Business Deadline: 8 Assumptions: 8 Systems Analysis: 10 Data Dictionary: Data Elements 12 Data Dictionary: Data Flows 15 Data Dictionary: Process Descriptions: 18 Data Dictionary: External Entities 21 Data Dictionary: Data Store 24 List of Constraints: 25 Forms and Reports: 26 Alternative Solutions: 29 ... Show more content on Helpwriting.net ... The factors for the loss of revenue are: 1) Having an outdated application/ database server, 2) Having outdated sales and inventory management software, and 3) Not implementing e–commerce as a business model. We depend on the server to maintaining accurate data, in terms of inventory and sales data. Ziggy's Suit shop cannot maintain accurate sales, and customer transactions. The problems seem to reflect the outdated sales management software being used at the time. The Ziggy's Suit Department is having additional problems with maintaining accurate designer inventory data this includes; quantity of products hand, amount products sold, amount of inventory on order, price at point of sale, and the expansion of new designer inventory. Project Definition Document 1) Company Name: Ziggy's Suit Shop 2) Project Manager: Zachary Powe 3) Division: N/A 4) Sponsor: Mrs. Constance Jolly 5) Project Name: Ziggy's Suit Department Problem Statement: My Company is losing customers and revenue to competitors. The factors for the loss of revenue are: 1) Having an outdated application/ database server, 2) Having outdated sales and inventory management software, and 3) Not implementing e–commerce as a business model. We depend on the server to maintaining accurate data, in terms of inventory and sales data. Ziggy's Suit shop cannot maintain accurate sales, and
... Get more on HelpWriting.net ...
What The Software Design Life Cycle? Assignment 2 P5 To achieve P5, learners are expected to: a) Describe and explain what the Software Design Life Cycle is The SDLC Software design life cycle is used for the design and development stage of a software system. It's the structure for design and development the life cycle has multiple stages, there are 9 in total. Requirements, Specification, Design, implementation, testing and debugging, deployment, maintenance and post mortem. All of these stages are part of the software design life cycle. The reason they use the SDLC is to see if the software there producing is up to standards meets their desire of design. b) Describe and explain the nine necessary stages of the life cycle: Requirements This is the first step of the ... Show more content on Helpwriting.net ... Specification This is the second step of SDLC it's called Specification in this stage both developers and clients are deciding on who their going to realise the software for the age audience. The hardware and software requirements to make sure its compatible with the users for example if their making it for Mac or Windows they need to make it compatible for that OS. Other specification the input and output of the data and what's needed to show the user. So the main specification to cover is the function of the software and hardware but also the security system logging in and out. Design Design is the third stage of the SDLC. This is thinking more into the visual side of the process by planning the code and design for the software, by designing the GUI/user interface. Creating diagrams for the visual look doing a flow diagram and the step of that process. Once the developers have decided on the design of the software such as the interface and creating the diagrams they would then move on to the fourth stage of SDLC Implementation This is the fourth stage of SDLC, the implementation is putting the physical code design that was created from the design stage and making it. This part of the process can slow the project down even though you have planned it you can still run into problems and errors this could delay the process. The developers that have built the software they then need to move
... Get more on HelpWriting.net ...
Accounting Information Systems Chapter One As accounting students we have studied a variety of accounting areas involving financial and taxes. The accounting information course appears to be a course that heads in a different direction then what we as students have become accustomed to. Speaking for myself I have always been drawn to the accounting field because it is a black and white area. In other words, there it is organized and has right and wrong answers, this leaving out the gray areas between right and wrong. Accounting information systems appears to be throwing us into a whole new area of the study of accounting. The fine line between right and wrong is becoming smudged into a gray area. With accounting information system we are being thrown into an area ... Show more content on Helpwriting.net ... One of the groups is sponsored/commercial information that has the main interest of making a profit by selling products and their services. The second type is going to be popular/practitioner information and is put through a review process. Both of these groups can be bias but the second group will usually be trustworthy. However, we will need to keep in mind that the writer of the second group may have a motive. The third group is the scholarly information group which also has been put through a review process. This third group is written by people with higher degrees and can be hard for undergraduates to interpret. Information on accounting information systems will need to be reviewed and looked over carefully to make sure that it is valid information and something that we should really consider before it is used. I have chosen these points in the text as important ones because the conceptual framework is one that we should become familiar with because it should be there throughout our education and follow us into our careers because it was developed to be used as a guide for any future accounting principle. The construction of an accounting information system is also important because we are going to need to know what the accounting information system is constructed of because there may be a day that we will be asked to help with the development and we should know the basic concept of it and what it is. Chapter Two Chapter two is a review of the material that was ... Get more on HelpWriting.net ...
Application And Application Of Real Estate INDEX S.no Topic Page No 1. Abstract 2. Introduction 3. Existing Examination System 4. New system and advantages 5. Software and Harware Requierrment 6. SRS 7. Detailed Design 8. Entity Relaionship Diagram 9. DFD'S Diagram 10. Database Table Structure 11. Screenshorts ABSTRACT My topic for internship was to design real estate website .This website provides the user to find the home flat and an buy nd sell the propety .To develop this application I used net beans for web application and oracle for database . I learned how to work on net beans that has been designed for building integrated web and application development tooling. Real estate sector in india has become a long way by becoming one of the fastest growing market in the world. It is not only successfully attracting domestic real estate developers but foreign investors as well. The growth of industry is attributed mainly to a large population base ,rising income level,and rapid urbanization Company Briefing YASH PAL BUILDERS AND DEVELOPERS PRIVATE LIMITED has started in 14–12–2009 and its a 5 years old company, which is located in Delhi, Delhi. This is categorized under in INDIA. As per the last information, this company is in status. Also It has engaged __ Directors. YASH PAL BUILDERS AND DEVELOPERS PRIVATE LIMITED is registered but doesn 't have company secretary information. YASH PAL BUILDERS AND DEVELOPERS PRIVATE LIMITED ... Get more on HelpWriting.net ...
System Analysis And Design Analysis What is System analysis and design? System analysis and design performed by system analysts its need to explain data flow completely, transform data, store data and some of them. System analysis and design refers to improve the better procedures and methods and determine the nature of the organization improving the performance and goals. What we need for the system analysis and design without any proper planning leads to user dissatisfaction and causes the system to failure. New technologies are need for the system analysis like Ajax is not a programming language but it uses the existing languages to make web sites and desktop applications where as system analysts will generate and redesign the web pages by using the Ajax technology. What are the roles for the system analyst it will tell about the users how easily interacted with the technology. Mainly, analyst must be work with the experienced workers that which are working with the customers. System analyst takes a responsible role that of an agent of change i.e. serves as a catalyst for change. What is the concept of the System analysis? System can refer to it any set of components which functions into inter related manner for a common cause of our objective. How will what you have learned assist you in achieving further academic and/or work related goals? In these system analysis and design we have so much information to learn and it will be helpful in your future carrier I want to mention some topics ... Get more on HelpWriting.net ...
Description Of Data Flow Diagram Essay CHAPTER III METHODOLOGY Methods Sample: Internet, Interview, Observation, Library Design Descriptive Non–experimental Context Diagram Description of Context Diagram Data Flow Diagram Description of Data Flow Diagram System Flow Chart Visual Table of Content Respondents Sampling Technique Sample Size Instrumentation Validity and Reliability Operational Definition of Variables Procedure Questionnaire Administration Data Gathering Data Processing Data Analysis Limitations Definition of Terms References CHAPTER III METHODOLOGY This chapter presents the methodology of the study including the design, respondents, instrumentation, procedure, and limitations. Methods and techniques The proponent used a research method to gather information's data and facts as a helping too that a help in making and to develop the system. The information gathered will be applied to the study. Survey Method The Proponents are conduct survey to 30 persons, to know what is the commonly problem of the shop, why the customers waiting so long. The survey form is the best way to knows what are the problems and suggestions of customers. Survey form is a proof or evidence that there is a problem in their zagu shop in terms of ordering. In that situation or study, Proponents can now take solutions in their problem. It's easy now to solve the problem because you already know what are the reasons and suggestions of the customers. Analyze carefully the data or information to take ... Get more on HelpWriting.net ...
Demarco's Systems Analysis Method Essay Outline the structured specification produced by DeMarco's systems analysis method. What do you think are the main advantages of specifying a computer–based system by means of such a structured specification? How adequately, do you think, does this method deal with the human aspects of information systems changes? According to DeMarco's structured analysis, it is a study of a problem leading to the specification of a new system prior to implementation of that system. DeMarco also makes it very clear in his book (The Structured Analysis and System Specification – a Yourdon Book) that the most important product of the analysis phase of the life cycle is the specification document. Different organizations are using ... Show more content on Helpwriting.net ... 3. Transform Descriptions: Use Structured English, Decision Tables, and Decision Trees to document the internals of the DFD in a detailed manner. Structured English is a specification language. It uses a limited vocabulary and a limited syntax. The vocabulary consist only of – imperative English language verbs – terms defined in the Data Dictionary – certain reserved words for logic formulation The syntax of a Structured English is limited to – simple declarative sentence – closed–end decision construct – closed–end repetition construct Decision Table is a table of entries that are actions and policies. Decision Tree is a graphic presentation of a Decision Table. The qualities of DeMarco's Structured Specification can be summarized in 7 steps: 1. It should be graphic: An easy to understand presentation of the subject matter is depicted by Data Flow Diagrams. DFDs give a meaningful picture of what is being specified. 2. It should be partitioned: The system is decomposed into processes. The processes are the basic elements on the Data Flow Diagram. 3. It should be rigorous: A highly detailed documentation of the interfaces is provided by the Data
... Get more on HelpWriting.net ...
Case Study Of Stationary Shop 4. SYSTEM ANALYSIS 4.1 STUDY OF CURRENT SYSTEM  First thing in the Analysis model is Study of Existing System, which is available. Without Study of Existing system Analysis Model cannot proceed.  Here current system is manual system. In manual system records of all required order detail, process details as well as customer detail are kept in one book.  Then on the basis of those details invoice is created and kept also in one book. And information of delivery detail is also kept in one book. And then admin makes an entry of payment, invoice, receipt, sale, and purchase in different books.  So rate of data redundancy is high because same data is needed to be stored in more than one place. And even if any of those books will be misplaced ... Show more content on Helpwriting.net ...  Schedule feasibility: Software must be completed within one year. 4.5 FEATURES OF NEW SYSTEM The project "Online Stationary Shop" includes features mentioned below : Customer Detail Delivery Detail Order Detail Process Card Detail Product Detail Brand Detail Delivery Challan Invoice Reports Search Description: Registration: First of all, in this module only reporter can registration. After registration, he/she can get authentication to login in this application, and obtain unique mobile number and password. Login: After registration, authenticated reporter can login with their mobile number and password and can access the application.
Home Page: Home page shows primary information about the e–Magazine with having links for all the other functionality like registration, login, news, Supplements, Sub–attachment etc. . About Us: About us the information about e–Magazine Contact Us: Contact us the use contact admin Display News: User can Read only news .it can not interfear in news only authenticated reporter post news and upload photos. Display Supplements: Update/Add suppliment by authenticated reporter. Display ... Get more on HelpWriting.net ...
Online Voting System Resources Required:– Development Tool:– PHP Database– My Sql Server– WAMP Server INTRODUCTION–: "ONLINE VOTING SYSTEM" is an online voting technique. It is based on the other online services like "ONLINE RESERVATION SYSTEM" .In this system people who have citizenship of INDIA and whose age is above 18 years of any [censored] can give hisher vote online without going to any polling booth. There is a DATABASE which is maintained by the ELECTION COMMISION OF INDIA in which all the names of voter with complete information is stored. SCOPE–: – This system will increase the voting percentage in India. – If high security is applied then it may reduce false vote. WORKING–: In "ONLINE VOTING SYSTEM" a voter can use hisher voting right online ... Show more content on Helpwriting.net ... Voter's vote in a database. Calculation of total number of votes. Various operational works that are done in the system are:– Recording information of the Voter in Voter database. Checking of information filled by voter. Discard the false information. cach information is sent to ELECTION COMMISSION OF INDIA. 2.3 Project Requirements Hardware Requirements (Processor RAM Disk Space) Pentium II, Pentium III, Pentium IV, Higher 128 Mb or Higher 130 Mb Software Requirements (Operating System Database) Win–98, Win–XP, Linux, My SQL 2.4 User Characteristics Every user should be: Comfortable with Internet Browser. He must have brief knowledge of voting system. He must also have basic knowledge of English too. 2.5 Constraints gUI is only in English. Login and password is used for identification of Voter. 2.6 Definitions of problems Not User Friendly: The existing system is not user friendly because the retrieval of data is very slow
and data is not maintained efficiently. Difficulty in report generating: We require more calculations to generate the final result so it is generated at the end of the session. And the voter not get a single chance to change hisher vote. Time consuming: Every work is done manually so we cannot generate report in the middle of the session or as per the requirement because it is very time consuming. CHAPTER–3 FEASIBILITY STUDY Depending on the results of the initial investigation the survey is now expanded to a more ... Get more on HelpWriting.net ...
BSA 375 Complete Course Link name BSA 375Week 1 Discussion Question 1 Why do heuristics and biases play a major role in the success or failure of an IT project? What specific kinds are the most influential factors, in general and for your specific organization? How does organization culture play a role in the successful reliance on the Joint Application Development (JAD) process to identify and gather business requirements? Would JAD work in your company? Explain why or why not. BSA 375Week 1 Discussion Question 2 Based on Tallon and Scannell's (2007) article, describe information life cycle management (ILM) and the relationship to the cost of storage. Based on Mitchell's (2007) article, explain how Musicland stores were converted to the ... Show more content on Helpwriting.net ... Cite and discuss 3 to 4 references, in addition to the required readings, that are relevant to the assignment. Include citations and references, using the approved style guide format. Submit section 2 of the final paper. BSA 375Week 4 Discussion Question 1 Is testing a distinct phase of a project, or does it come into play during other phases? Explain your answer. How might tools help the quality and effectiveness of testing? Based on Walsh's (2007) article, explain why end–user satisfaction should be used in addition to return on investment (ROI) when measuring new systems. BSA 375Week 4 Discussion Question 2 Based on Davidson and Kumagai's (2008) article, list three advantages and risks associated with open source software. BSA 375week 4 Individual Assignment Service Request SR–rm–004, Part 3 Paper – create using Riverpoint Individual Assignment: Service Request SR–rm–004, Part 3 Paper Complete section 3 of 3 for the final paper This week's assignment incorporates the transition from design to implementation. You may consider revising sections 1 and 2 based upon faculty feedback. Prepare a 4–6 page paper that accomplishes the following: Describe the implementation stage for this project. Include a discussion on the six major activities for the implementation stage as described within the text: Coding. Testing. Installation. Documentation. Training. Support. The discussion on these six ... Get more on HelpWriting.net ...
Systems Analysis : A System Analysis Assignment 1 A system analysis is a person that studies and observes the problems and needs of a system to make it work properly for the job at hand. A system analysis would research a problem, plan solutions and recommend software to improve the system. It is a systems analysis job to be observe every detail of a system so they are completely familiar with it and know it very well, so that they are able to accurately and efficiently scan the system for problems and work out possible improvements. They would specialize in analysing and designing computer systems, first they would plan the system to make sure it is possible and feasible, in terms of time, economically, and legally. Once this has been done and checked over for mistakes the analysis would then be given the go ahead by their superiors and will carry out a investigation into the system to gather information to help build a picture of it, they will use specialised fact finding techniques to do this. Once this process has been given the approval of everyone involved in the project the system analysis stage begins. This is where the analyst analyses the problem the business is facing with a computer system. They will analysis the old system with the problems and find out the requirements for the new system. In the end the analyst will have the deliverable which is a set of system requirements for the new system. Here are some responsibilities of a typical system analysis; Speak with a systems users to learn ... Get more on HelpWriting.net ...
Project Synopsis Online Student Registration System Synopsis Submitted by Mr. XXXXX XXXXXX in partial fulfillment for the award of the degree of BCA (Bachelor of Computer Application) IN MUMBAI XXX XXXXXXXX College Mumbai University : Mumbai – 400001 January – 2010 A PROJECT REPORT ON ONLINE STUDENT REGISTRION SYSTEM A PROJECT REPORT Submitted by ATANU MAITY in partial fulfillment for the award of the degree of Bachelor of Computer Application XXX ENGINEERING COLLEGE, MUMBAI MUMBAI UNIVERSITY:: MUMBAI 400001 JANUARY 2010 MUMBAI UNIVERSITY: MUMBAI 400 001 BONAFIDE CERTIFICATE Certified that this project report "................Online Student Registration ... Show more content on Helpwriting.net ... Student can registered and login into the system. Can view test result and give online test. Student must able to change his/ her own password. Complete web based system no installation required to run the application in client system. Student result must save and can be retrieving later on. Question must provide answer type like multiple right answer selection and one right answer selection. Test screen must provide options accordingly. System must able to evaluate the examination and display the result instantly, student must view the correct answer after complete the test. System has powerful logical access management in place, each user must be identified by login id and strict password policy is applied to secure the system Generate various reports for administration like, Total students/members registered for examination, no of available examination, test given by the student. 1.3 Project Scope The Online Student Registration System will permit to register and take online examination and maintaining master information and generating various reports of test. The main users of the project are Student or Member and system Administrator. From an end–user perspective, the Online Student Registration System Project consists of following functional elements: enhanced student registration module, ... Get more on HelpWriting.net ...
Implementing Android Based Application For Attendance... ABSTRACT Education system nowadays has become advanced in India. There is a lot of development of the technology in India. Some of the modern trends examples in educational system are smart class, conferencing, etc. Due to this type of applications, institute may fulfil vision and accomplish their goals. The idea of our project is to implement android based application for Attendance Management System for colleges, schools, institutes. The project will be an application like online attendance record and parent intimation in android. It would help student to check their attendance report online through android phone and would also help faculties to take attendance in smartphone rather than registers and also store the records in the database. When student attendance gets low below the specified attendance a threshold will be sent to the student via SMS. LIST OF TABLES Table No Table Description Page No. 1. STUDENT 13 2. FACULTY 13 3. STREAM 13 4. ATTENDANCE 14 5. REMARKS 14 6. BLACKLIST 14 7. PRINCIPLE 15 LIST OF FIGURES Figure No Figure Description Page No 1. E–R DIAGRAM 6 2. DFD LEVEL 0 7 3. DFD LEVEL 1 7 4. DFD LEVEL 2 9 5. USE–CASE DIAGRAM 10 6. SEQUENCE DIAGRAM 11 7. ... Get more on HelpWriting.net ...
Outline The Principles Of System Analysis Outline the principles of system analysis Need for Growth The drivers are need for advance and many businesses need to expand into new markets they develop new products and also increase their turnover and profits for them to do this they have` to plan effectively and they often will have to incorporates system analysis. Need to increase productivity The sales may have improved but there is also a need to improve capacity, also the activity of the competitors may require that the company their ability to respond The more employers that are working on the system means that it may slow it down or cause an expansion in terms of physical space of multiple sites Reduce costs To reduce the costs they need to be more efficient and improve the turnover ratio especially in times of economic recession A company may need to makes their systems less labour intensive or costly they can do this by saving money. Developmental tools They are things like data flow diagrams and activity diagrams What are data flow diagrams? A data flow diagram (DFD) is a graphical symbol of the flow of data through an information system What are activity diagrams? An activity diagram is graphical representation of workflows They can be used to describe the business and operational step by step workflows of components in a system; an activity diagram shows the overall flow of control in a system Techniques of systems analysis How to gather all the information, you could do surveys or interviews in order to ... Get more on HelpWriting.net ...
Railway Route Optimizer TABLE OF CONTENTS S.NO. CONTENTS PAGE NO. 1. Abstract 2. Introduction 1. Organization Profile 3. System Analysis 1. Existing system 2. Problem Definition 3. Proposed System 4. Requirement Analysis 5. Requirement Specifications 6. Feasibility study 4. System Design 1. Project Modules 2. Data Dictionary 3. Data Flow Diagrams 4. E–R Diagrams 5. Hardware And Software Requirements 5. System Testing 6. Software Tools Used 7 Technical Notes 1. Introduction To Real–time programming 2. Introduction to OOPS and Windows ... Show more content on Helpwriting.net ... In this train–id unique and this attribute does not allow any duplicate values Route : This module maintains the data about routes between stations and This module handle the routes tables and fields are route–id, starting–station, destination, timetakenforordinary, and timetakenforexpress. The module shows the graphical representation of a route between starting–station and destination. This module is very useful to know routes between any two stations and also know shortest path among the routes, and also gives graphical representation of the corresponding routes Search : This module maintains the data about trains, routes tables and this module gives reports on trains and routes, this module In this project has two active actors they are 1. Administrator 2.Traveller Administrator: The administrator has privileges on Stations, Trains, and Routes he can Add data into these tables and allow all operations on these tables. Once data is stored into these tables after the traveler can send a query on that data for generating reports. And he can easily find out which is the shortest path between two stations Traveler: The traveler has only privileges on search for a train and a route. The traveler sends queries to server and gets reports on the requested data and he will get graphical ... Get more on HelpWriting.net ...
Online Reservation System of Dagupan Garden Village Hotel CHAPTER 1 INTRODUCTION 1.1 Background of the Study A hotel is an establishment that provides paid lodging on a short–term basis. The provision of basic accommodation, in times past, consisting only of a room with a bed, a cupboard, a small table and a washstand has largely been replaced by rooms with modern facilities. As internet technology has improved, so have reservation systems. Today, it is possible through online, to make a reservation for a hotel anywhere in the world. Hotels can create Web site and post new content on it every day. Dagupan Garden and Dagupan Village Hotels are twin hotels nestled in a calm suburban area of Dagupan City away from the hustle and activity of the city's main commercial and business center. The ... Show more content on Helpwriting.net ... At that stage the proponents determine the specifications of the management's real needs. 1. Identifying basic requirements The proponents will determine the basic requirements including the needed resources for the proposed system such as the computer, internet connection, the existing web site of the hotel and books for research activities. 2. Developing initial prototype The initial prototype is developed and the proponents will design the user interface of the proposed system. 3. Review The proponents will examine the prototype and will make some additions or changes to the proposed system. 4. Revising and enhancing the prototype The proponents will make some corrections and will formulate more concepts to be applied in enhancing the prototype. CHAPTER 2 THE EXISTING SYSTEM 2.1 Overview of the Existing System In this chapter the proponents will discuss about the existing system, the traditional way of reserving a room and event on a hotel. In able to reserve, the guest will make reservations through a phone call. This traditional way of making reservations does not provide convenience for the guest. Through phone calls occasionally the guest and the reserving clerk don't understand each other and no clear conversations. The information from the guest will not be accurately recorded in the registry form. Another way of reserving a room and event is through ... Get more on HelpWriting.net ...
Case Study On System Requirement Modeling In this assignment I will be using assignment 2:1 case study to my system requirements. In this case study we learn about a company called URCovered, which is an auto insurance companies and they were developing a mobile application to improve their customer services and customer experience in their claims management department. To develop this mobile applications projects this will required a system requirement model, a requirement model, data process model, a DFD, data dictionary, object modelling and final a use case diagram System Requirement Modelling In the system requirement modelling this in be a fact gathering for information or fact finding, questions will be place to our customer such as surveys, face to face interviews so we can ... Get more on HelpWriting.net ...
Kudler Fine Foods Essay Kudler Fine Foods wishes to develop a system to track customer purchases through a Frequent Shopper Program to award loyalty points for redemption. The objective of this project request is to track purchases of individual customers, which will accumulate as loyalty points for redemption (Apollo Group, 2011). Customers will have the ability to redeem loyalty points for gift items, specialty foods, and other products or services as made available (Apollo Group, 2011). Statement of Scope and Goals General Project Information: Project Name: Kudler Fine Foods Frequent Shopper Program Management desires an increase in revenue based on the existing customer base. A frequent shopper plan serves as the preferred method ... Show more content on Helpwriting.net ... The Frequent Shopper program is to bring the benefit of an increase in revenue for Kudler Fine Foods. Kudler has partnered with a loyalty points program to provide customers with points which can be redeemed for gifts, airline upgrades, and specialty foods. Additional objectives may to obtain a higher customer base, increase customer satisfaction, and gain customer loyalty. These opportunities can be measured and weighed against the costs of the project. The feasibility study will determine if the costs of partnership are feasible for the desired benefits. Operational Feasibility Operational feasibility examines the likelihood that the project will meet the desired objectives (Valacich, George, & Hoffer, 2009). In this study, the design team will attempt to understand the degree to which the system will take advantage of the opportunities to increase revenue, increase customer satisfaction, increase customer base, and gain customer loyalty. Technical Feasibility Technical feasibility examines the company's ability to successfully construct the proposed system. The project team must analyze whether the organization has the appropriate knowledge and skills needed for completion of the system. Hardware, software, and other system requirements must be addressed and the team must determine if the company is technologically inclined to proceed with the project with the current technology. Summary of Current Business Process [pic] Figure 1 – Business ... Get more on HelpWriting.net ...
Systems Analysis And Design Of Iain 's & Co Systems Analysis and Design Help sheet: Introduction: For this unit I have been asked to produce a database for 'Iain's & Co' who are a large building service company, but before that I have to plan everything out by analysing and designing the database for the company's newly taken over smaller company. Scenario: Iain's & Co are a large building company who at present have employed IT technicians in order for their technical aspects to be managed and to also support the IT users in the company. In recent time Iain's & Co s have taken over a smaller company who require some help with their database as they want to include some new features that can improve and link both company data's together in order to manage the two sites on one database. Outline principles of systems analysis: What is a system analysis? A system analysis is a data processing method that is widely used in the business department for breaking down a problem into different parts to reduce the difficulty of the problem and identifying the needs to solve the problem more easily and more efficiently. This will be helping Iain's & Co greatly because they need a system that can break down problems so that it reduces the difficulty of the problem. What is an SSADM? Structured Systems Analysis and Design Method is also more commonly known as SSADM, which is an amalgamation of text and diagrams through the entire life cycle of a system design, from the planning of the design idea to the actual design of the ... Get more on HelpWriting.net ...
Intro to System Analysis and Design Introduction to System Analysis and Design 1. INTRODUCTION Systems are created to solve problems. One can think of the systems approach as an organized way of dealing with a problem. In this dynamic world, the subject System Analysis and Design, mainly deals with the software development activities. 2. Defining Your System A collection of components that work together to realize some objective forms a system. Basically there are three major components in every system, namely input, processing and output. [pic] In your system define the different components that are connected to each other and how they are interdependent. Remember the objective of the system demands that some output is produced as a result of processing the suitable ... Show more content on Helpwriting.net ... System Analysis also includes sub–dividing of complex process involving the entire system, identification of data store and manual processes. The main points you are to discuss in your papers regarding system analysis are: Specification of what the new system is to accomplish based on the user requirements. Functional hierarchy showing the functions to be performed by the new system and their relationship with each other. Function network which are similar to function hierarchy but they highlight those functions which are common to more than one procedure. List of attributes of the entities – these are the data items which need to be held about each entity (record) (d) System Design Based on the user requirements and the detailed analysis of a new system, the new system must be designed. This is the phase of system designing. It is a most crucial phase in the development of a system. Normally, the design proceeds in two stages: preliminary or general design Structure or detailed design Preliminary or general design: In the preliminary or general design, the features of the new system are specified. The costs of implementing these features and the benefits to be derived are estimated. If the project is still ... Get more on HelpWriting.net ...
Consolidation Paper On System Analysis And Design REFELECTIVE CONSOLIDATION PAPER ON SYSTEM ANALYSIS AND DESIGN Lawrence Technological University, Southfield, MI. Dr.Anne Kohnke, PhD. ABSTRACT I am delight to be the part of Master of Science in Information Technology (MSIT) Graduate program at Lawrence Technological University. This experience has been thoroughly enlightening and increasing my intellectual ability with the latest and greatest technological advances. The purpose of the reflective paper is to provide an subject exposure to a vast stream of knowledge like the fundamentals of being a system analyst, understanding and designing systems, project management, information gathering techniques, using data flow diagrams ... Show more content on Helpwriting.net ... System analysis and design is the scientific method of breaking down a system into its component pieces and studying how well those component parts work and interact to accomplish their main purpose. In essence, this course introduced me to the art of solving problems with the aim of making a person or an organization's work easier and more efficient. In the course of learning, I learnt how system analysis and design employs a four pronged approach to solving these problems; planning, analysis, design and implementation. Mainly the system development life cycle (SDLC) is the process of understanding how information system can support business needs, designing the system, building it, and delivering it to users. In my study of system analysis and design, I have come to appreciate several concepts that I have learnt throughout the course. More than anything else the system analysis is a creative activity. The analyst must frame the whole such that it can be analyzed. The analysis must work with all levels of an organization, data, work progress, gathering information through a host of sources, and somehow shape these into a cogent whole and the rest of the document describes in broad strokes how to frame any system, how to harness these to create the documents necessary for implementing a new plan. The analyst must be aware of the organization from the abstract level (e.g., the mission statement), to the data and technical level, the ... Get more on HelpWriting.net ...
Client Technology Tracking System Essays Client Technology Tracking System (CTTS) System Analysis and Design [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] 2011 Client Technology Tracking System (CTTS) System Analysis and Design [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] 2011 Table of Contents Executive Summary 2 Company Overview 3 Section 1: Methods and Procedure 5 Methods 5 The ... Show more content on Helpwriting.net ... This kind of situation seems to happen almost every day. Anna suggests a company wide database that would store this kind of information. (Exhibit A–1) * Meeting between Anna Kelly (analyst/programmer), Kathy Grey (receptionist/bookkeeper), Doug Drake (system integrator), and Ben Logan (IT consultant). * How things are currently handled at the company are covered. (Exhibit A–2) For illustrating the results of the fact finding and problem formulation we used Problem Statements matrices, Problems, Opportunities, Objectives, and Constraints Matrices etc. For the analysis and design of the new system, we used DFDs (context diagram, diagram 0), use case diagram and use case narratives, ERD and interface design. The DFDs and ERD diagram are designed using Microsoft Visio 2007, and the interfaces are designed using visual studio 2008. * Problem Statement Matrix * * Problems, Opportunities, Objectives, Constraints Matrix * Cause and effect analysis is a technique in which problems are studied to determine their cause and effects * Use–Case Glossary * List of Use–Cases 1. Use Case – A behaviorally related sequence of steps (scenario), both automated and manual, for the purpose of completing a single business task. Description of system functions from the perspective of external users in terminology they understand.
* Use–Case Model ... Get more on HelpWriting.net ...
A Report on Process Modeling for Web-Based Customer... Introduction This report based on a Process Modeling for Web–Based Customer Relationship Management System. It is a business requirement analysis stage in a software development life cycle. This report describes about the problem in given case study and it gives the decision making for that problems. 1.1 Customer relationship management Customer relationship management (CRM) is a most essential part in the modern business world. Customer relationship management may be a process or methodology. The CRM concerns understand about customer's needs and their behaviors in order to grow the business to leading more in competitive business world and better service for the customers (Chic McSherry). It helps to learn about customers, company's sales, and service issues. The CRM helps to a business in this ways, To give better customer service To increase customer income To identify, acquire and retain new customers To simplify marking and sales processes To control workflow and documentation procedures (Ellen Gifford (2002)). 1.2 Data Flow Diagram (DFD) Structuring the requirement is developed after the requirement analysis. The structuring the requirement means graphically represents the data process what captured in requirement analysis. Data–flow diagram is graphical tool, which shows how a data flow occur in a system. It consider like from where the data comes and where it goes and where the data are stored. Usually the graphical representation begins with ... Get more on HelpWriting.net ...
School Management System SCHOOL MANAGEMENT SYSTEM PROJECT REPORT By– PRAVEEN SHEKHAR PANKAJ PANDEY PUNEET KUSHWAHA NEERAJ CHAUDHARY Under Able Guidance of– Mr. S.S. Soam Department of Computer Science & Engineering Institute of Engineering & Technology, Lucknow Institute of Engineering & Technology Lucknow Abstract We propose a system that shall enable a SCHOOL MANAGEMENT SYASTEM interfaced with a computer to be managed remotely using personal computers. A client running on the user's computer would connect to a central server, over an Internet connection. The user could then use a HTTP protocol from a personal computer to connect to the central server, and issue requests for borrowing books. In this report we describe a system – the web enabled software that ... Show more content on Helpwriting.net ... When people have a good connectivity at their disposal, with tremendous power of distributed computing to supplement the same, we can think of "connecting their personal computers to the real world applications of managing school or any institute". With this, people would be able to connect and disconnect, and manage the handling of school at their home even from a distant place. One of the very basic examples of a utility of this is – there is no old file system now,every task is now online. Students can deposit their school fees online now either by credit/debit cards or by internet banking via bank gateway.Student registration will be online,Hostel allotment,Mess bills,Libray management will all come under this. 1.1 Few Terms This Project is a web application developed for managing Institute of Engineering & Technology. This project will work as an interface between the students and faculty members of the college . It will be able to keep the records of all the students, their attendances,salaries of faculty members,mess bills of students,data about hostels, and will allow them to register themselves on our site to seek for the study materials from library even. This Project chiefly focuses on: School: A school is a collection of students,faculties, information, sources, resources, and services: it is organized for use and maintained by a public body, an institution, or a private individual. The School Management System: School ... Get more on HelpWriting.net ...
Sysyem Lovely Professional University, Punjab Course Code CSE312 Course Category Course Title SYSTEM ANALYSIS AND DESIGN Courses with conceptual focus Course Planner 14810::Jagwinder Kaur Lectures 3.0 Tutorials Practicals Credits 0.0 0.0 3.0 TextBooks Sr No T–1 Title Analysis and Design of Information Systems Reference Books Sr No R– 1 Other Reading Sr No OR–1 OR–2 OR–3 OR–4 OR–5 OR–6 OR–7 OR–8 OR–9 OR–10 OR–11 OR–12 OR–13 OR–14 OR–15 OR–16 OR–17 Journals articles as Compulsary reading (specific articles, complete reference) http://vceit.com/infodata/index.htm , http://www.scribd.com/doc/9657422/Transaction–Processing–System–TPS , http://www.cisjournal.org/archive/vol2no1/vol2no1_1.pdf , http://www.albany.edu/acc/courses/fall97/acc681/ch7.html ... Show more content on Helpwriting.net ... tion To Information Systems Development(System Development Strategies–system development life cycle method, structured analysis development method, systems prototyping method) Managing The Application Development Portfolio (Information system Planningreason for initiating Information System projects, sources of project request–government agencies, department managers, senior executives, system analysts.) Managing The Application Development Portfolio(Managing project review & Selectionsteering committee method, information systems committee method, User–groups Committee Methods.) Managing The Application Development Portfolio(Project development strategy selectioninstitutional, end user development, applications for end user.) Analysis Phase(Feasibility Study, feasibility considerations, steps in feasibility analysis) T–1:ch 1 OR–4 OR–5 OR–6 explain each system development strategy the knowledge to select slide show the best methods for data input, file storage and access, processing , and output for a given situation describe the role of slide show general managers in the evaluation of information system opportunities Week 2
Lecture 4 T–1:ch 2 information system planning Lecture 5 T–1:ch 2 OR–3 discuss various committee methods write a system project request case study of Sevco industries profile Lecture 6 T–1:ch 2 OR–3 how institutional and end user develpoment strategies differs and where to use them decide whether ... Get more on HelpWriting.net ...
Summer Training Project Report On Book Store Management... AMITY UNIVERSITY SUMMER TRAINING PROJECT REPORT ON BOOK STORE MANAGEMENT SYSTEM SUBMITTED BY: PARNAY TYAGI ENROLLMENT NO. A1049513014 PROJECTGUIDE: Dr. Dolly Sharma Acknowledgement I am thankful to everyone who supported me for the completion of my project on time. It is my profound privilege and pleasure to express the over whelming sense of gratitude , devotion and regards to my project guide "Dr. Dolly Sharma" for her valuable suggestions, timely guidance and words of encouragement during the project word. Without her co–operation this project would not have been in the form as it is today. Also I am very grateful to "teachers",for their kind support and guidance for the accomplishment of this project work. Parnay Tyagi Roll No.:A1049513014 Course :BCA+MCA(DUAL) CERTIFICATE This to to certify that this is a bonafied record of the project work done satisfactorily on the title "BOOK STORE MANAGEMENT SYSTEM" in "C" LANGUAGE by Parnay Tyagi, Enrollment no. A1049513014 in the partial fulfillment of BCA+MCA(DUAL). Project guide name Dr. Dolly Sharma INTRODUCTION Today the world has become technosavy and everything is automated. Automation reduces manual work and saves time. BOOK STORE MANAGEMENT SYSTEM is one that offers many flexible and convenient features allowing librarians and library users to maximize time and efficiency. The aim is to reduce the manual work of keeping the track of all the books from time to time and ... Get more on HelpWriting.net ...
Documentation of Examination System Entrance Examination System Documentation Members: John Paul Conde John Mark Monilla Jocel Floirendo Sebastian Barot Kenneil Khong Hun Table of Contents Chapter 1 – Basic Planning Phase 1.1 Background of the Company 1.2 Project Study Definition & Description 1.2.1 Description of the Study 1.2.2 Policies Related to the Study 1.2.3 Definition of Terms 1.3 Scope & Limitation of the Study 1.4 Task & Duration of the Study 1.5 Duties & Responsibilities of the Personnel Involved Chapter 2 – System Analysis Phase 2.1 Data Gathering Techniques 2.2 Analysis Tools 2.2.1 Context Diagram 2.2.2 Data Flow Diagram 2.3 Problem Analysis 2.4 Description of the Properties System 2.5 ... Show more content on Helpwriting.net ... User – It refers to a person using an information system. Username – It refers to an identifier of a user. Visual Basic(VB) – It refers to a software used of any programmer in developing a system. 1.3 Scope & Limitation of the Study Entrance Examination System focuses on the examinees and its result is automatically computed once the student is done on answering the questionnaires. It has an Admission and Proctor in order to control and maintain the questionnaires and results of the Entrance Examination System. The students can print the result once the process of their examination has been done. Entrance Examination System has: Login Form – For security information. Admin Form – Main control of the system. Student/User Form – For the students who will taking up an exam. Examination Form – For the examination process of the system. Limitation of the Study: The Entrance Examination System focuses only on a highschool graduate student and the system is not an online program. 1.4 Task & Duration of the Study
1.5 Duties & Responsibilities of the Personnel Involved There are 5 members are involved on this system: John Paul Conde John Mark Monilla Sebastian Barot Jocel Floirendo Kennel Khong Hun John Paul Conde and Kenneil Khong Hun are responsible for the documentation process, John Mark Monilla as the lead programmer Jocel Floirendo and Sebastian Barot are responsible for the design of the program. Chapter ... Get more on HelpWriting.net ...
Hotel Management System Essay Major System Features and Functions The system will automate many of the manual procedures that are being used by management, front desk, and room services at the Hotel Computer Science. After preliminary analysis of the requirement specifications a system with the following functions will best satisfy the needs of the hotel management and staff. Hotel Management System Overview The following level one data flow diagram characterizes the types of inputs and outputs and the interactions that the staff may expect from the hotel reservation system. Level One Data Flow Diagram Breakdown of the System Modules A more detailed analysis of the modules that will be involved in creating a functional hotel management system reveals the need to ... Show more content on Helpwriting.net ... The front desk will have access to create, delete, edit current bills, and registration forms of customers. Also take and post messages for customers. The kitchen staff will have access to edit room service order forms, special requirements and will be able to have read access to menus. Data Structures & Algorithms Our decision to implement the Hotel Management system using standard PC technology and a commercial database product has narrowed our choices of implementation algorithms and data structures. We have chosen to implement this system with a PC database program (Access) that uses a relational data model. Basically what this means is that related data is grouped together in what can be logically viewed as a columnar table of records. Each record within a particular table is composed of a number of fields that hold the relevant information. Each record can be uniquely described by on or more fields in the record. These fields are refered to as the records primary key. Information is retrieved from the table by specifying the records primary key. The entire system is made up on a number of tables, each of which can be thought of as describing one logical entity. For example a custmomer is represented by a table that has field entries corresponding to the customers name, address and so on. Information about each customer is retrieved by specifying the customers name which is the primary key for the customer table. With this basic inforamton ... Get more on HelpWriting.net ...

Analyzing Systems Using Data Flow Diagrams

  • 1.
    Analyzing Systems UsingData Flow Diagrams Chapter 9 Analyzing Systems Using Data Flow Diagrams Key Points and Objectives 1. Data flow diagrams (DFDs) are one of the main methods available for analyzing data–oriented systems. 2. Through the use of (DFDs), which emphasize the logic underlying the system, the systems analysts can put together a graphical representation of data movement through the organization. 3. The data flow approach has four main advantages over the narrative explanation of the data movement. They are: A. Freedom from committing to the technical implementation of the system too early B. B. Further understanding of the interrelationships of systems and subsystems C. C. Communicating current system knowledge to users through data flow ... Show more content on Helpwriting.net ... Better communication with users. They are familiar with how the business operates. B. More stable systems, since the design is based on a business framework. C. Increased understanding of the business by analysts. D. The system will have increased flexibility and be easier to maintain. E. Elimination of redundancy. 15. Physical data flow diagrams show how the system operates or how the new system will be implemented. Physical data flow diagrams include: A. Clarifying which processes are manual and which are automated. B. Describing processes in greater detail. C. Sequencing processes in the order they must be executed. D. Temporary data stores and transaction files. E. Specifying actual document and file names. F. Controls to ensure accuracy and completeness. 16. Physical data flow diagrams include processes for adding, reading, changing, and deleting records. CRUD is an acronym for Create, Read, Update, Delete. 17. A CRUD matrix shows which programs or processes add, read, update or delete master file records. 18. Master or transaction files are used to link all processes that operate at different times. 19. An input flow from an external entity is sometimes called a trigger, since it starts activities. 20. Elements (or fields) are categorized as either: A. Base elements, that are keyed into the system. B. Derived elements, which are the result of some operation, such as arithmetic or logic. 21. Another approach used to ... Get more on HelpWriting.net ...
  • 3.
    P1 : OutlineThe Principles Of Systems Analysis Contents P1 – Outline the principles of systems analysis 2 P2 – Illustrate the stages of a development life cycle 3 P3 – Explain the benefits of structured analysis 4 M1 – Discuss the most appropriate uses of different development lifecycle models 5 P1 – Outline the principles of systems analysis System Analysis is the study where detailed information about the components and requirements of a system, the information needs of an organisation, the characteristics and current components of the systems and the user functional requirements of the systems that is proposed system. The Waterfall life cycle model The waterfall lifecycle was the first process model to be introduced and widely known. It is also known as the linear–sequential ... Show more content on Helpwriting.net ... An Example of entities in retail context could be Item ID, Colour, Size and Price. Data Flow Modelling – This is the process of modelling and recording how data flows around a system. A Data Flow Model is made up of connected Data Flow Diagrams (DFD) which are supported by appropriate documentation. DFDs represent the processes and functions within a system (activates that transform data from one form to another), data stores (file storage, external entities (things that send data into a system or receive data from a system) and finally data flows (show the flow of data around the system). Entity Event Modelling – This is the process of identifying, displaying and documenting the business events that affect each entity and the sequence in which these events occur. An Entity/Event Model is made up of a set of Entity Life Histories (one for each entity) and appropriate supporting documentation. Key drivers for staring a new project: Given that the development of new systems can be fraught with problems and delays, there are many factors that drive organisations to develop new systems. The most important drives come directly from the companies needs and are often not related to technology, but however to technological solutions, these include: A need to reduce staff costs – having a new system that can carry out the same job as employees has become a popular drive for a new system in an organisation, which ... Get more on HelpWriting.net ...
  • 5.
    Hotel Management System CONTENTS1. INRODUCTION Page No. An Overview Mission of the Project Background Study The Organization Profile Study on Existing System 2. SYSTEM ANALYSIS Study on Proposed System Defining the problem Developing Solution Strategies User Requirement Specification Software Requirement Specification System Specification Application Specification Hardware Specification Software Specification Network Specification Cost Estimation and Scheduling Final ... Show more content on Helpwriting.net ... N Solutions software development services cover the complete project life cycle, from requirement assessment and task definition, to solution development, to implementation and integration, followed by support and maintenance. The ability to integrate software with existing systems by expanding information systems infrastructure is an important advantage of N Solutions as a turn– key solution provider. N Solutions expertise covers the following areas: Enterprise Application Integration; Data Warehousing and Decision Support; Electronic Document Management; Information Security; Internet/Intranet and e–Commerce solutions. Excellent quality of N Solutions software development is guaranteed by their team of professionals with certified skills and experienced project managers. N Solutions also ensures quality control at all stages of development process. Transparent software development process and interaction with the customer are taken utmost care at N Solutions. They give their clients a real commercial advantage by the professionalism, flexibility and specialist knowledge 1.3.2. Study on Existing System EXISTING SYSTEM Hotel Management involves maintaining various operations of the hotel like Booking or reservations of the rooms, Cancellation of the ... Get more on HelpWriting.net ...
  • 7.
    Designing A ModelUsing Structured Analysis Techniques At the conclusion of the requirements phase, the team has agreed upon the needs of the business and what must be required of the new system. The next step in designing and implementing the new system is determining the processes that will be applied to the data and graphically representing them in a model using structured analysis techniques. Process models are used to identify and document the portion of system requirements that relates to data. Processes are the logical rules that are applied to transform the data into meaningful information. During this phase, data flow diagrams are required to show how the data will move through the system. The systems data flow and data stores are then documented in the data dictionary, which is used ... Show more content on Helpwriting.net ... An entity relationship diagram visually describes the objects of the data and their relationship to one another. Business process diagrams show how data moves through the organization using processes performed by an individual. Managers, developers, and users then review and approve the diagrams and documentation generated before proceeding to the next modeling phase. With the completion of the logical model, a physical model is outlined to portray the actual design of a database. Physical modeling illustrates the integration of the data requirements that were recognized during logical modeling into a system structure that will be implemented. A physical model creates objects using symbols such as tables and columns based on entities and attributes that were defined during logical modeling. Constraints, such as primary keys, foreign keys and other unique keys, are defined in this modeling phase. It is crucial to have a well–informed, knowledgeable design team in the development of the physical model. "To ensure that all information system needs are met, physical models are often developed jointly by a team representing the data administration, database administration, and application development areas" (CA ERwin Data Modeler Methods Guide – CA, n.d.). Physical modeling is database specific, which means the objects defined during physical modeling can vary depending on the database software being used. The hardware of a company ... Get more on HelpWriting.net ...
  • 9.
    Overview of SystemDevelopment Life Cycle (SDLC) System development life cycle is a process use for the period of development system. SDLC contains four main steps those are analysis, planning, design and implementation during the analysis steps of dataflow diagram used to process the model of a system. A consistency of the context diagram to lower dataflow diagram is very important for easy process model of a system, manual consistency check from context to lower level data flow diagram using a checklist is time intense process SDLC is methodology utilization throughout the improvement of programming framework beginning from arranging until the execution stage. Information stream outlining, on the other hand, is utilized to prepare the procedure model throughout the examination stage [12]. Procedure model is exceptionally imperative in characterizing the prerequisites in a graphical perspective. Accordingly, the unwavering quality of the methodology model is the key component to enhance the execution of the accompanying stages in SDLC. SDLC is likewise used to see on how an data framework can help business necessities, outlining the framework, fabricating the framework and conveying the framework to clients [12]. SDLC comprises of four principal stages, which are examination, outline, execute and testing stages. In the examination stage, prerequisites of a framework are distinguished and refined into a procedure model. Procedure model could be utilized to speak to the methodologies or exercises that are ... Get more on HelpWriting.net ...
  • 11.
    Systems Analysis AndRole Of The Systems Analyst Assignment 1 – Task 1 (P1) (P1 – 1) An explanation of what Systems Analysis is and the role of the Systems Analyst. Discuss Systems Analysis and the role of the Systems Analyst A system analyst is an important part of a business, who is usually an IT professional, specializing in analyzing, designing and implementing information systems. The primary role of a system analyst is to assess situations, and the suitability of information systems, and then study the problems and improvements needed within a certain organisation and come up with a way that these changes can be made effectively. It is the role of the system analyst to research problems, plan solutions, recommend software/systems and to overall co–ordinate the development of the ... Show more content on Helpwriting.net ... The system analyst will then examine the project thoroughly and go through any potential faults they think will cause a major issue for the company, and make plans to solve them as quickly and effectively as possible. The primary purpose of the system analyst at this stage is to gather information as much information as possible and determine any specific requirements needed for e.g. software, which will be specified in the requirements specification. The end product of the system analyst stage is known as the deliverable – which will be the end set of requirements that the analyst has chosen for the project. A system analyst can have the following duties: Interacting with any internal users/customers in order to learn and document any requirements Write up any specified technical requirements. Give presentations about their findings to clients and colleagues Interact with designers in order to understand software limitations. Help the programmers during system development Perform the system testing. Deploy the completed system. Document the system development & contribute to user manuals and training. (P1 – 2) A discussion of the reasons why an organisation might initiate a Systems Analysis project... TELOS. Discuss the reasons why an organisation might initiate a Systems Analysis project To improve efficiency Improve ease of use Make use of new technology ... Get more on HelpWriting.net ...
  • 13.
    Cooks Emporium IsA Small Retail Business Operating Out Essay Cooks Emporium is a small retail business operating out of Main Street in Downtown Ames. It has been in operation for around 30 years, and serves the Ames community with quality and creative kitchenware to suit every need. Because of its roots in community oriented cooking, it also operates cooking classes open to the public so that everyone can share in the delicious knowledge that has been accumulated through decades of cooking through its members. Even though Cooks Emporium has been in business for a few decades amongst massive technological changes, it has managed to attempt the use of information systems to suit its needs. However, because the operation is small and has a simple but main mission to spread the joy of cooking, the owners and employees have not been able to efficiently utilize the proper information systems to ensure smooth operation of the business. On a high level, the main information system within Cooks Emporium can be divided up into the different functional areas that all come together to assure that the business can fully operate. Cooks Emporium employs the use of accounting systems (Mainly outsourced), communication systems, payment processing systems, and also inventory management information systems. All of these functional areas come together to form the main connected information system (As represented in the Context Diagram). Inevitably, when one area of the information system starts to fail with what it can offer, it can start to ... Get more on HelpWriting.net ...
  • 15.
    Essay Inventory ControlAutomated Office System (Icaos) Inventory Control Automated Office System David Pierce Individual Project IS316 – Systems Analysis and Design Professor: Erlan Burk Park University Fall II 2010 Table of Contents System Description 2–3 Functional Description 4–5 Data Dictionary 6–8 Context Level Diagram and Child Diagram 9–12 System Input, Output Forms, and Interfaces 13–14 Testing, Maintenance and Auditing 15 System Description System Name Inventory Control Automated Office System (ICAOS) Type of System ICAOS is an Automated Office System using an Oracle Database and front end application. The ICAOS will coincide with the current timekeeping ... Show more content on Helpwriting.net ... System Boundaries The ICAOS will be on a dedicated server, and the input functions will be accessed by warehouse personnel and management. The reporting and tracking functions will be accessed by supervisors and management only via a pass code. External Interfaces The ICAOS will interface with the current online ordering system, and will generate orders within the system. Once the order is downloaded into the system, it can be accessed by management or supervisors, and scanned for input by employees. The bills of lading also function the same way on the receiving end. The current ordering system allows vendors to send shipment contents electronically, and they can be accessed for input by employees by scanning the bill of lading. Internal Interfaces The ICAOS will also interface with the current KRONOS time keeping system. This will allow for efficiency tracking and report generation that can tell the number of items received, moved, or shipped per hour by employee. System Relationship With Organizational Mission The warehouse mission is to provide the right product at the right time at the right price. This system will allow the managers and supervisors to not only ensure that each and every employee is dedicated to that mission, but it will allow them to track the products in inventory, and forecast needs more accurately, so as to provide the customer with excellent ... Get more on HelpWriting.net ...
  • 17.
    Systems Development andDocumentation Techniques CHAPTER 3 SYSTEMS DEVELOPMENT AND DOCUMENTATION TECHNIQUES SUGGESTED ANSWERS TO DISCUSSION QUESTIONS 3.1 Identify the DFD elements in the following narrative: A customer purchases a few items from a local grocery store. Jill, a salesclerk, enters the transaction in the cash register and takes the customer's money. At closing, Jill gives both the cash and the register tape to her manager. Data Flows: merchandise, payment, cash and register tape Data Source: customer Processes: capture sales and payment data and collect payment, give cash and register tape to manager Storage: sales file (register tape), cash register 3.2 Do you agree with the following statement: "Any one of the systems documentation procedures can be used to ... Show more content on Helpwriting.net ... converting source documents to magnetic tape using a computer–based optical character reader (OCR) d. processing OCR documents online to update a database on magnetic disk 3.1 (continued) Assorted Flowcharting Segments e. reading data from a magnetic disk into the computer to be printed on a report f. using a computer or terminal to </inst>key data from source documents to a file stored on a magnetic disk g. manually sorting and filing invoices numerically 3.1 (continued) Assorted Flowcharting Segments h. using a terminal to enter source document data and send it to a </inst>remote location where an online processing system records it in a database stored on magnetic disk i. a scheduled automatic backup of an internal hard drive to an external hard drive j. using a terminal to </inst>query customer sales data maintained on a magnetic disk 3.1 (continued) Assorted Flowcharting Segments k. enter employee hours recorded on time cards in the payroll transaction file maintained on disk and update wage data maintained on the payroll master file 3.1 (continued) Assorted Flowcharting Segments l. use a terminal to </inst>access a price list maintained on disk to complete a purchase order. An electronic copy of the purchase order is sent to ... Get more on HelpWriting.net ...
  • 19.
    System Analysis andDesign System Analysis and Design Syllabus SYSTEM ANALYSIS AND DESIGN Module 1: Data and Information (3) Types of information: operational, tactical, strategic and statutory – why do we need information systems – management structure – requirements of information at different levels of management – functional allocation of management – requirements of information for various functions – qualities of information – small case study. Module 2: Systems Analysis and Design Life Cycle (3) Requirements determination – requirements specifications – feasibility analysis – final specifications – hardware and software study – system design – system implementation – system evaluation – system modification. Role of systems analyst – attributes of a ... Show more content on Helpwriting.net ... 2. 1 3 1 3. 2. Systems Analysis and Design Life Cycle 4. 5. 0.5 1 3 1 3. Information gathering 4. Feasibility analysis 6. Feasibility analysis, final specifications, hardware and software study, system design, system implementation, system evaluation, system modification. 7. Role of systems analyst – attributes of a systems analyst – tools used in system analysis 8. Information gathering, strategies, methods 9. Case study/documenting study, system requirements specification, from narratives of requirements to classification of requirements as strategic, tactical, operational and statutory. Example case study 10. How to formulate project goals and quantify them 11. Examining alternative solutions and evaluating proposed solutions a) Technical feasibility b) Operational feasibility c) Economic
  • 20.
    feasibility 12. Costbenefit analysis, Documenting feasibility report 13. Developing Data Flow Diagrams (DFD) a) What are DFDs? b) Symbols used in DFD c) Rules of data flow d) Good style ... Get more on HelpWriting.net ...
  • 22.
    IT Solutions Essay 1.Identify suitable business data, data elements, data types, and resources, based on the following interview between a database analyst and a lecturer from Sutherland University: Business Data Data Elements Data Types Resources Course Course code Course name Course start date Course end date Integer Character Date Date Admin Classes Class name Start date End date Time Location Class capacity Integer Date Date Date time Integer Variable Admin Students Student ID Student name Grade Integer Character Variable Admin 2. a. Describe the characteristic of second normal form in a normalization process A relation is said to be in Second Normal Form (2NF) if and only if it is already in first normal ... Show more content on Helpwriting.net ... Case study: Easy Drive Easy Drive is a car rental company that offers the best car hire prices in Australia. The company is located in Sydney, Melbourne, and Brisbane. Easy Drive branches could be found at all major airports and in downtown locations. In addition, online car reservation system is also provided for the ease of the booking experience. Easy Drive is not only providing affordable prices, but also providing the best car rental experience. The company is well known for its excellent customer service. Moreover, Easy Drive has more than 12,000 vehicles that range from car, van, and busses. The company's goal is to keep increasing their service offering but partnering with various service providers. Due to the growth and expansion of the company, Easy Drive currently is in deep need of renewing its database system. Easy Drive has trusted WIC to model its data objects and to provide the company with a documentation of its business data model. It is vital for easy drive to have an accurate and reliable data, across all of its business processes in order to provide an excellent car rental experience to its customers. Thus, a detail list of business data and normalisation procedure is required to model the company's data. Interview ... Get more on HelpWriting.net ...
  • 24.
    Ziggy's Suit DepartmentSystems Analysis & Design Ziggy's Suit Department Systems Analysis & Design Zachary Powe ITM 6000–Final Project Mrs. Constance Jolly March 8, 2012 TABLE OF CONTENTS Business: 4 Organizational Chart: 5 Preliminary Investigation: 5 Project Definition Document 6 Problem Statement: 6 Project: 7 Mandatory Objectives: 7 Desirable Objectives: 7 Priority of Project: 7 Project Scope: 7 Terms of Reference: 8 Time/Business Deadline: 8 Assumptions: 8 Systems Analysis: 10 Data Dictionary: Data Elements 12 Data Dictionary: Data Flows 15 Data Dictionary: Process Descriptions: 18 Data Dictionary: External Entities 21 Data Dictionary: Data Store 24 List of Constraints: 25 Forms and Reports: 26 Alternative Solutions: 29 ... Show more content on Helpwriting.net ... The factors for the loss of revenue are: 1) Having an outdated application/ database server, 2) Having outdated sales and inventory management software, and 3) Not implementing e–commerce as a business model. We depend on the server to maintaining accurate data, in terms of inventory and sales data. Ziggy's Suit shop cannot maintain accurate sales, and customer transactions. The problems seem to reflect the outdated sales management software being used at the time. The Ziggy's Suit Department is having additional problems with maintaining accurate designer inventory data this includes; quantity of products hand, amount products sold, amount of inventory on order, price at point of sale, and the expansion of new designer inventory. Project Definition Document 1) Company Name: Ziggy's Suit Shop 2) Project Manager: Zachary Powe 3) Division: N/A 4) Sponsor: Mrs. Constance Jolly 5) Project Name: Ziggy's Suit Department Problem Statement: My Company is losing customers and revenue to competitors. The factors for the loss of revenue are: 1) Having an outdated application/ database server, 2) Having outdated sales and inventory management software, and 3) Not implementing e–commerce as a business model. We depend on the server to maintaining accurate data, in terms of inventory and sales data. Ziggy's Suit shop cannot maintain accurate sales, and
  • 25.
    ... Get moreon HelpWriting.net ...
  • 27.
    What The SoftwareDesign Life Cycle? Assignment 2 P5 To achieve P5, learners are expected to: a) Describe and explain what the Software Design Life Cycle is The SDLC Software design life cycle is used for the design and development stage of a software system. It's the structure for design and development the life cycle has multiple stages, there are 9 in total. Requirements, Specification, Design, implementation, testing and debugging, deployment, maintenance and post mortem. All of these stages are part of the software design life cycle. The reason they use the SDLC is to see if the software there producing is up to standards meets their desire of design. b) Describe and explain the nine necessary stages of the life cycle: Requirements This is the first step of the ... Show more content on Helpwriting.net ... Specification This is the second step of SDLC it's called Specification in this stage both developers and clients are deciding on who their going to realise the software for the age audience. The hardware and software requirements to make sure its compatible with the users for example if their making it for Mac or Windows they need to make it compatible for that OS. Other specification the input and output of the data and what's needed to show the user. So the main specification to cover is the function of the software and hardware but also the security system logging in and out. Design Design is the third stage of the SDLC. This is thinking more into the visual side of the process by planning the code and design for the software, by designing the GUI/user interface. Creating diagrams for the visual look doing a flow diagram and the step of that process. Once the developers have decided on the design of the software such as the interface and creating the diagrams they would then move on to the fourth stage of SDLC Implementation This is the fourth stage of SDLC, the implementation is putting the physical code design that was created from the design stage and making it. This part of the process can slow the project down even though you have planned it you can still run into problems and errors this could delay the process. The developers that have built the software they then need to move
  • 28.
    ... Get moreon HelpWriting.net ...
  • 30.
    Accounting Information Systems ChapterOne As accounting students we have studied a variety of accounting areas involving financial and taxes. The accounting information course appears to be a course that heads in a different direction then what we as students have become accustomed to. Speaking for myself I have always been drawn to the accounting field because it is a black and white area. In other words, there it is organized and has right and wrong answers, this leaving out the gray areas between right and wrong. Accounting information systems appears to be throwing us into a whole new area of the study of accounting. The fine line between right and wrong is becoming smudged into a gray area. With accounting information system we are being thrown into an area ... Show more content on Helpwriting.net ... One of the groups is sponsored/commercial information that has the main interest of making a profit by selling products and their services. The second type is going to be popular/practitioner information and is put through a review process. Both of these groups can be bias but the second group will usually be trustworthy. However, we will need to keep in mind that the writer of the second group may have a motive. The third group is the scholarly information group which also has been put through a review process. This third group is written by people with higher degrees and can be hard for undergraduates to interpret. Information on accounting information systems will need to be reviewed and looked over carefully to make sure that it is valid information and something that we should really consider before it is used. I have chosen these points in the text as important ones because the conceptual framework is one that we should become familiar with because it should be there throughout our education and follow us into our careers because it was developed to be used as a guide for any future accounting principle. The construction of an accounting information system is also important because we are going to need to know what the accounting information system is constructed of because there may be a day that we will be asked to help with the development and we should know the basic concept of it and what it is. Chapter Two Chapter two is a review of the material that was ... Get more on HelpWriting.net ...
  • 32.
    Application And ApplicationOf Real Estate INDEX S.no Topic Page No 1. Abstract 2. Introduction 3. Existing Examination System 4. New system and advantages 5. Software and Harware Requierrment 6. SRS 7. Detailed Design 8. Entity Relaionship Diagram 9. DFD'S Diagram 10. Database Table Structure 11. Screenshorts ABSTRACT My topic for internship was to design real estate website .This website provides the user to find the home flat and an buy nd sell the propety .To develop this application I used net beans for web application and oracle for database . I learned how to work on net beans that has been designed for building integrated web and application development tooling. Real estate sector in india has become a long way by becoming one of the fastest growing market in the world. It is not only successfully attracting domestic real estate developers but foreign investors as well. The growth of industry is attributed mainly to a large population base ,rising income level,and rapid urbanization Company Briefing YASH PAL BUILDERS AND DEVELOPERS PRIVATE LIMITED has started in 14–12–2009 and its a 5 years old company, which is located in Delhi, Delhi. This is categorized under in INDIA. As per the last information, this company is in status. Also It has engaged __ Directors. YASH PAL BUILDERS AND DEVELOPERS PRIVATE LIMITED is registered but doesn 't have company secretary information. YASH PAL BUILDERS AND DEVELOPERS PRIVATE LIMITED ... Get more on HelpWriting.net ...
  • 34.
    System Analysis AndDesign Analysis What is System analysis and design? System analysis and design performed by system analysts its need to explain data flow completely, transform data, store data and some of them. System analysis and design refers to improve the better procedures and methods and determine the nature of the organization improving the performance and goals. What we need for the system analysis and design without any proper planning leads to user dissatisfaction and causes the system to failure. New technologies are need for the system analysis like Ajax is not a programming language but it uses the existing languages to make web sites and desktop applications where as system analysts will generate and redesign the web pages by using the Ajax technology. What are the roles for the system analyst it will tell about the users how easily interacted with the technology. Mainly, analyst must be work with the experienced workers that which are working with the customers. System analyst takes a responsible role that of an agent of change i.e. serves as a catalyst for change. What is the concept of the System analysis? System can refer to it any set of components which functions into inter related manner for a common cause of our objective. How will what you have learned assist you in achieving further academic and/or work related goals? In these system analysis and design we have so much information to learn and it will be helpful in your future carrier I want to mention some topics ... Get more on HelpWriting.net ...
  • 36.
    Description Of DataFlow Diagram Essay CHAPTER III METHODOLOGY Methods Sample: Internet, Interview, Observation, Library Design Descriptive Non–experimental Context Diagram Description of Context Diagram Data Flow Diagram Description of Data Flow Diagram System Flow Chart Visual Table of Content Respondents Sampling Technique Sample Size Instrumentation Validity and Reliability Operational Definition of Variables Procedure Questionnaire Administration Data Gathering Data Processing Data Analysis Limitations Definition of Terms References CHAPTER III METHODOLOGY This chapter presents the methodology of the study including the design, respondents, instrumentation, procedure, and limitations. Methods and techniques The proponent used a research method to gather information's data and facts as a helping too that a help in making and to develop the system. The information gathered will be applied to the study. Survey Method The Proponents are conduct survey to 30 persons, to know what is the commonly problem of the shop, why the customers waiting so long. The survey form is the best way to knows what are the problems and suggestions of customers. Survey form is a proof or evidence that there is a problem in their zagu shop in terms of ordering. In that situation or study, Proponents can now take solutions in their problem. It's easy now to solve the problem because you already know what are the reasons and suggestions of the customers. Analyze carefully the data or information to take ... Get more on HelpWriting.net ...
  • 38.
    Demarco's Systems AnalysisMethod Essay Outline the structured specification produced by DeMarco's systems analysis method. What do you think are the main advantages of specifying a computer–based system by means of such a structured specification? How adequately, do you think, does this method deal with the human aspects of information systems changes? According to DeMarco's structured analysis, it is a study of a problem leading to the specification of a new system prior to implementation of that system. DeMarco also makes it very clear in his book (The Structured Analysis and System Specification – a Yourdon Book) that the most important product of the analysis phase of the life cycle is the specification document. Different organizations are using ... Show more content on Helpwriting.net ... 3. Transform Descriptions: Use Structured English, Decision Tables, and Decision Trees to document the internals of the DFD in a detailed manner. Structured English is a specification language. It uses a limited vocabulary and a limited syntax. The vocabulary consist only of – imperative English language verbs – terms defined in the Data Dictionary – certain reserved words for logic formulation The syntax of a Structured English is limited to – simple declarative sentence – closed–end decision construct – closed–end repetition construct Decision Table is a table of entries that are actions and policies. Decision Tree is a graphic presentation of a Decision Table. The qualities of DeMarco's Structured Specification can be summarized in 7 steps: 1. It should be graphic: An easy to understand presentation of the subject matter is depicted by Data Flow Diagrams. DFDs give a meaningful picture of what is being specified. 2. It should be partitioned: The system is decomposed into processes. The processes are the basic elements on the Data Flow Diagram. 3. It should be rigorous: A highly detailed documentation of the interfaces is provided by the Data
  • 39.
    ... Get moreon HelpWriting.net ...
  • 41.
    Case Study OfStationary Shop 4. SYSTEM ANALYSIS 4.1 STUDY OF CURRENT SYSTEM  First thing in the Analysis model is Study of Existing System, which is available. Without Study of Existing system Analysis Model cannot proceed.  Here current system is manual system. In manual system records of all required order detail, process details as well as customer detail are kept in one book.  Then on the basis of those details invoice is created and kept also in one book. And information of delivery detail is also kept in one book. And then admin makes an entry of payment, invoice, receipt, sale, and purchase in different books.  So rate of data redundancy is high because same data is needed to be stored in more than one place. And even if any of those books will be misplaced ... Show more content on Helpwriting.net ...  Schedule feasibility: Software must be completed within one year. 4.5 FEATURES OF NEW SYSTEM The project "Online Stationary Shop" includes features mentioned below : Customer Detail Delivery Detail Order Detail Process Card Detail Product Detail Brand Detail Delivery Challan Invoice Reports Search Description: Registration: First of all, in this module only reporter can registration. After registration, he/she can get authentication to login in this application, and obtain unique mobile number and password. Login: After registration, authenticated reporter can login with their mobile number and password and can access the application.
  • 42.
    Home Page: Homepage shows primary information about the e–Magazine with having links for all the other functionality like registration, login, news, Supplements, Sub–attachment etc. . About Us: About us the information about e–Magazine Contact Us: Contact us the use contact admin Display News: User can Read only news .it can not interfear in news only authenticated reporter post news and upload photos. Display Supplements: Update/Add suppliment by authenticated reporter. Display ... Get more on HelpWriting.net ...
  • 44.
    Online Voting System ResourcesRequired:– Development Tool:– PHP Database– My Sql Server– WAMP Server INTRODUCTION–: "ONLINE VOTING SYSTEM" is an online voting technique. It is based on the other online services like "ONLINE RESERVATION SYSTEM" .In this system people who have citizenship of INDIA and whose age is above 18 years of any [censored] can give hisher vote online without going to any polling booth. There is a DATABASE which is maintained by the ELECTION COMMISION OF INDIA in which all the names of voter with complete information is stored. SCOPE–: – This system will increase the voting percentage in India. – If high security is applied then it may reduce false vote. WORKING–: In "ONLINE VOTING SYSTEM" a voter can use hisher voting right online ... Show more content on Helpwriting.net ... Voter's vote in a database. Calculation of total number of votes. Various operational works that are done in the system are:– Recording information of the Voter in Voter database. Checking of information filled by voter. Discard the false information. cach information is sent to ELECTION COMMISSION OF INDIA. 2.3 Project Requirements Hardware Requirements (Processor RAM Disk Space) Pentium II, Pentium III, Pentium IV, Higher 128 Mb or Higher 130 Mb Software Requirements (Operating System Database) Win–98, Win–XP, Linux, My SQL 2.4 User Characteristics Every user should be: Comfortable with Internet Browser. He must have brief knowledge of voting system. He must also have basic knowledge of English too. 2.5 Constraints gUI is only in English. Login and password is used for identification of Voter. 2.6 Definitions of problems Not User Friendly: The existing system is not user friendly because the retrieval of data is very slow
  • 45.
    and data isnot maintained efficiently. Difficulty in report generating: We require more calculations to generate the final result so it is generated at the end of the session. And the voter not get a single chance to change hisher vote. Time consuming: Every work is done manually so we cannot generate report in the middle of the session or as per the requirement because it is very time consuming. CHAPTER–3 FEASIBILITY STUDY Depending on the results of the initial investigation the survey is now expanded to a more ... Get more on HelpWriting.net ...
  • 47.
    BSA 375 CompleteCourse Link name BSA 375Week 1 Discussion Question 1 Why do heuristics and biases play a major role in the success or failure of an IT project? What specific kinds are the most influential factors, in general and for your specific organization? How does organization culture play a role in the successful reliance on the Joint Application Development (JAD) process to identify and gather business requirements? Would JAD work in your company? Explain why or why not. BSA 375Week 1 Discussion Question 2 Based on Tallon and Scannell's (2007) article, describe information life cycle management (ILM) and the relationship to the cost of storage. Based on Mitchell's (2007) article, explain how Musicland stores were converted to the ... Show more content on Helpwriting.net ... Cite and discuss 3 to 4 references, in addition to the required readings, that are relevant to the assignment. Include citations and references, using the approved style guide format. Submit section 2 of the final paper. BSA 375Week 4 Discussion Question 1 Is testing a distinct phase of a project, or does it come into play during other phases? Explain your answer. How might tools help the quality and effectiveness of testing? Based on Walsh's (2007) article, explain why end–user satisfaction should be used in addition to return on investment (ROI) when measuring new systems. BSA 375Week 4 Discussion Question 2 Based on Davidson and Kumagai's (2008) article, list three advantages and risks associated with open source software. BSA 375week 4 Individual Assignment Service Request SR–rm–004, Part 3 Paper – create using Riverpoint Individual Assignment: Service Request SR–rm–004, Part 3 Paper Complete section 3 of 3 for the final paper This week's assignment incorporates the transition from design to implementation. You may consider revising sections 1 and 2 based upon faculty feedback. Prepare a 4–6 page paper that accomplishes the following: Describe the implementation stage for this project. Include a discussion on the six major activities for the implementation stage as described within the text: Coding. Testing. Installation. Documentation. Training. Support. The discussion on these six ... Get more on HelpWriting.net ...
  • 49.
    Systems Analysis :A System Analysis Assignment 1 A system analysis is a person that studies and observes the problems and needs of a system to make it work properly for the job at hand. A system analysis would research a problem, plan solutions and recommend software to improve the system. It is a systems analysis job to be observe every detail of a system so they are completely familiar with it and know it very well, so that they are able to accurately and efficiently scan the system for problems and work out possible improvements. They would specialize in analysing and designing computer systems, first they would plan the system to make sure it is possible and feasible, in terms of time, economically, and legally. Once this has been done and checked over for mistakes the analysis would then be given the go ahead by their superiors and will carry out a investigation into the system to gather information to help build a picture of it, they will use specialised fact finding techniques to do this. Once this process has been given the approval of everyone involved in the project the system analysis stage begins. This is where the analyst analyses the problem the business is facing with a computer system. They will analysis the old system with the problems and find out the requirements for the new system. In the end the analyst will have the deliverable which is a set of system requirements for the new system. Here are some responsibilities of a typical system analysis; Speak with a systems users to learn ... Get more on HelpWriting.net ...
  • 51.
    Project Synopsis Online StudentRegistration System Synopsis Submitted by Mr. XXXXX XXXXXX in partial fulfillment for the award of the degree of BCA (Bachelor of Computer Application) IN MUMBAI XXX XXXXXXXX College Mumbai University : Mumbai – 400001 January – 2010 A PROJECT REPORT ON ONLINE STUDENT REGISTRION SYSTEM A PROJECT REPORT Submitted by ATANU MAITY in partial fulfillment for the award of the degree of Bachelor of Computer Application XXX ENGINEERING COLLEGE, MUMBAI MUMBAI UNIVERSITY:: MUMBAI 400001 JANUARY 2010 MUMBAI UNIVERSITY: MUMBAI 400 001 BONAFIDE CERTIFICATE Certified that this project report "................Online Student Registration ... Show more content on Helpwriting.net ... Student can registered and login into the system. Can view test result and give online test. Student must able to change his/ her own password. Complete web based system no installation required to run the application in client system. Student result must save and can be retrieving later on. Question must provide answer type like multiple right answer selection and one right answer selection. Test screen must provide options accordingly. System must able to evaluate the examination and display the result instantly, student must view the correct answer after complete the test. System has powerful logical access management in place, each user must be identified by login id and strict password policy is applied to secure the system Generate various reports for administration like, Total students/members registered for examination, no of available examination, test given by the student. 1.3 Project Scope The Online Student Registration System will permit to register and take online examination and maintaining master information and generating various reports of test. The main users of the project are Student or Member and system Administrator. From an end–user perspective, the Online Student Registration System Project consists of following functional elements: enhanced student registration module, ... Get more on HelpWriting.net ...
  • 53.
    Implementing Android BasedApplication For Attendance... ABSTRACT Education system nowadays has become advanced in India. There is a lot of development of the technology in India. Some of the modern trends examples in educational system are smart class, conferencing, etc. Due to this type of applications, institute may fulfil vision and accomplish their goals. The idea of our project is to implement android based application for Attendance Management System for colleges, schools, institutes. The project will be an application like online attendance record and parent intimation in android. It would help student to check their attendance report online through android phone and would also help faculties to take attendance in smartphone rather than registers and also store the records in the database. When student attendance gets low below the specified attendance a threshold will be sent to the student via SMS. LIST OF TABLES Table No Table Description Page No. 1. STUDENT 13 2. FACULTY 13 3. STREAM 13 4. ATTENDANCE 14 5. REMARKS 14 6. BLACKLIST 14 7. PRINCIPLE 15 LIST OF FIGURES Figure No Figure Description Page No 1. E–R DIAGRAM 6 2. DFD LEVEL 0 7 3. DFD LEVEL 1 7 4. DFD LEVEL 2 9 5. USE–CASE DIAGRAM 10 6. SEQUENCE DIAGRAM 11 7. ... Get more on HelpWriting.net ...
  • 55.
    Outline The PrinciplesOf System Analysis Outline the principles of system analysis Need for Growth The drivers are need for advance and many businesses need to expand into new markets they develop new products and also increase their turnover and profits for them to do this they have` to plan effectively and they often will have to incorporates system analysis. Need to increase productivity The sales may have improved but there is also a need to improve capacity, also the activity of the competitors may require that the company their ability to respond The more employers that are working on the system means that it may slow it down or cause an expansion in terms of physical space of multiple sites Reduce costs To reduce the costs they need to be more efficient and improve the turnover ratio especially in times of economic recession A company may need to makes their systems less labour intensive or costly they can do this by saving money. Developmental tools They are things like data flow diagrams and activity diagrams What are data flow diagrams? A data flow diagram (DFD) is a graphical symbol of the flow of data through an information system What are activity diagrams? An activity diagram is graphical representation of workflows They can be used to describe the business and operational step by step workflows of components in a system; an activity diagram shows the overall flow of control in a system Techniques of systems analysis How to gather all the information, you could do surveys or interviews in order to ... Get more on HelpWriting.net ...
  • 57.
    Railway Route Optimizer TABLEOF CONTENTS S.NO. CONTENTS PAGE NO. 1. Abstract 2. Introduction 1. Organization Profile 3. System Analysis 1. Existing system 2. Problem Definition 3. Proposed System 4. Requirement Analysis 5. Requirement Specifications 6. Feasibility study 4. System Design 1. Project Modules 2. Data Dictionary 3. Data Flow Diagrams 4. E–R Diagrams 5. Hardware And Software Requirements 5. System Testing 6. Software Tools Used 7 Technical Notes 1. Introduction To Real–time programming 2. Introduction to OOPS and Windows ... Show more content on Helpwriting.net ... In this train–id unique and this attribute does not allow any duplicate values Route : This module maintains the data about routes between stations and This module handle the routes tables and fields are route–id, starting–station, destination, timetakenforordinary, and timetakenforexpress. The module shows the graphical representation of a route between starting–station and destination. This module is very useful to know routes between any two stations and also know shortest path among the routes, and also gives graphical representation of the corresponding routes Search : This module maintains the data about trains, routes tables and this module gives reports on trains and routes, this module In this project has two active actors they are 1. Administrator 2.Traveller Administrator: The administrator has privileges on Stations, Trains, and Routes he can Add data into these tables and allow all operations on these tables. Once data is stored into these tables after the traveler can send a query on that data for generating reports. And he can easily find out which is the shortest path between two stations Traveler: The traveler has only privileges on search for a train and a route. The traveler sends queries to server and gets reports on the requested data and he will get graphical ... Get more on HelpWriting.net ...
  • 59.
    Online Reservation Systemof Dagupan Garden Village Hotel CHAPTER 1 INTRODUCTION 1.1 Background of the Study A hotel is an establishment that provides paid lodging on a short–term basis. The provision of basic accommodation, in times past, consisting only of a room with a bed, a cupboard, a small table and a washstand has largely been replaced by rooms with modern facilities. As internet technology has improved, so have reservation systems. Today, it is possible through online, to make a reservation for a hotel anywhere in the world. Hotels can create Web site and post new content on it every day. Dagupan Garden and Dagupan Village Hotels are twin hotels nestled in a calm suburban area of Dagupan City away from the hustle and activity of the city's main commercial and business center. The ... Show more content on Helpwriting.net ... At that stage the proponents determine the specifications of the management's real needs. 1. Identifying basic requirements The proponents will determine the basic requirements including the needed resources for the proposed system such as the computer, internet connection, the existing web site of the hotel and books for research activities. 2. Developing initial prototype The initial prototype is developed and the proponents will design the user interface of the proposed system. 3. Review The proponents will examine the prototype and will make some additions or changes to the proposed system. 4. Revising and enhancing the prototype The proponents will make some corrections and will formulate more concepts to be applied in enhancing the prototype. CHAPTER 2 THE EXISTING SYSTEM 2.1 Overview of the Existing System In this chapter the proponents will discuss about the existing system, the traditional way of reserving a room and event on a hotel. In able to reserve, the guest will make reservations through a phone call. This traditional way of making reservations does not provide convenience for the guest. Through phone calls occasionally the guest and the reserving clerk don't understand each other and no clear conversations. The information from the guest will not be accurately recorded in the registry form. Another way of reserving a room and event is through ... Get more on HelpWriting.net ...
  • 61.
    Case Study OnSystem Requirement Modeling In this assignment I will be using assignment 2:1 case study to my system requirements. In this case study we learn about a company called URCovered, which is an auto insurance companies and they were developing a mobile application to improve their customer services and customer experience in their claims management department. To develop this mobile applications projects this will required a system requirement model, a requirement model, data process model, a DFD, data dictionary, object modelling and final a use case diagram System Requirement Modelling In the system requirement modelling this in be a fact gathering for information or fact finding, questions will be place to our customer such as surveys, face to face interviews so we can ... Get more on HelpWriting.net ...
  • 63.
    Kudler Fine FoodsEssay Kudler Fine Foods wishes to develop a system to track customer purchases through a Frequent Shopper Program to award loyalty points for redemption. The objective of this project request is to track purchases of individual customers, which will accumulate as loyalty points for redemption (Apollo Group, 2011). Customers will have the ability to redeem loyalty points for gift items, specialty foods, and other products or services as made available (Apollo Group, 2011). Statement of Scope and Goals General Project Information: Project Name: Kudler Fine Foods Frequent Shopper Program Management desires an increase in revenue based on the existing customer base. A frequent shopper plan serves as the preferred method ... Show more content on Helpwriting.net ... The Frequent Shopper program is to bring the benefit of an increase in revenue for Kudler Fine Foods. Kudler has partnered with a loyalty points program to provide customers with points which can be redeemed for gifts, airline upgrades, and specialty foods. Additional objectives may to obtain a higher customer base, increase customer satisfaction, and gain customer loyalty. These opportunities can be measured and weighed against the costs of the project. The feasibility study will determine if the costs of partnership are feasible for the desired benefits. Operational Feasibility Operational feasibility examines the likelihood that the project will meet the desired objectives (Valacich, George, & Hoffer, 2009). In this study, the design team will attempt to understand the degree to which the system will take advantage of the opportunities to increase revenue, increase customer satisfaction, increase customer base, and gain customer loyalty. Technical Feasibility Technical feasibility examines the company's ability to successfully construct the proposed system. The project team must analyze whether the organization has the appropriate knowledge and skills needed for completion of the system. Hardware, software, and other system requirements must be addressed and the team must determine if the company is technologically inclined to proceed with the project with the current technology. Summary of Current Business Process [pic] Figure 1 – Business ... Get more on HelpWriting.net ...
  • 65.
    Systems Analysis AndDesign Of Iain 's & Co Systems Analysis and Design Help sheet: Introduction: For this unit I have been asked to produce a database for 'Iain's & Co' who are a large building service company, but before that I have to plan everything out by analysing and designing the database for the company's newly taken over smaller company. Scenario: Iain's & Co are a large building company who at present have employed IT technicians in order for their technical aspects to be managed and to also support the IT users in the company. In recent time Iain's & Co s have taken over a smaller company who require some help with their database as they want to include some new features that can improve and link both company data's together in order to manage the two sites on one database. Outline principles of systems analysis: What is a system analysis? A system analysis is a data processing method that is widely used in the business department for breaking down a problem into different parts to reduce the difficulty of the problem and identifying the needs to solve the problem more easily and more efficiently. This will be helping Iain's & Co greatly because they need a system that can break down problems so that it reduces the difficulty of the problem. What is an SSADM? Structured Systems Analysis and Design Method is also more commonly known as SSADM, which is an amalgamation of text and diagrams through the entire life cycle of a system design, from the planning of the design idea to the actual design of the ... Get more on HelpWriting.net ...
  • 67.
    Intro to SystemAnalysis and Design Introduction to System Analysis and Design 1. INTRODUCTION Systems are created to solve problems. One can think of the systems approach as an organized way of dealing with a problem. In this dynamic world, the subject System Analysis and Design, mainly deals with the software development activities. 2. Defining Your System A collection of components that work together to realize some objective forms a system. Basically there are three major components in every system, namely input, processing and output. [pic] In your system define the different components that are connected to each other and how they are interdependent. Remember the objective of the system demands that some output is produced as a result of processing the suitable ... Show more content on Helpwriting.net ... System Analysis also includes sub–dividing of complex process involving the entire system, identification of data store and manual processes. The main points you are to discuss in your papers regarding system analysis are: Specification of what the new system is to accomplish based on the user requirements. Functional hierarchy showing the functions to be performed by the new system and their relationship with each other. Function network which are similar to function hierarchy but they highlight those functions which are common to more than one procedure. List of attributes of the entities – these are the data items which need to be held about each entity (record) (d) System Design Based on the user requirements and the detailed analysis of a new system, the new system must be designed. This is the phase of system designing. It is a most crucial phase in the development of a system. Normally, the design proceeds in two stages: preliminary or general design Structure or detailed design Preliminary or general design: In the preliminary or general design, the features of the new system are specified. The costs of implementing these features and the benefits to be derived are estimated. If the project is still ... Get more on HelpWriting.net ...
  • 69.
    Consolidation Paper OnSystem Analysis And Design REFELECTIVE CONSOLIDATION PAPER ON SYSTEM ANALYSIS AND DESIGN Lawrence Technological University, Southfield, MI. Dr.Anne Kohnke, PhD. ABSTRACT I am delight to be the part of Master of Science in Information Technology (MSIT) Graduate program at Lawrence Technological University. This experience has been thoroughly enlightening and increasing my intellectual ability with the latest and greatest technological advances. The purpose of the reflective paper is to provide an subject exposure to a vast stream of knowledge like the fundamentals of being a system analyst, understanding and designing systems, project management, information gathering techniques, using data flow diagrams ... Show more content on Helpwriting.net ... System analysis and design is the scientific method of breaking down a system into its component pieces and studying how well those component parts work and interact to accomplish their main purpose. In essence, this course introduced me to the art of solving problems with the aim of making a person or an organization's work easier and more efficient. In the course of learning, I learnt how system analysis and design employs a four pronged approach to solving these problems; planning, analysis, design and implementation. Mainly the system development life cycle (SDLC) is the process of understanding how information system can support business needs, designing the system, building it, and delivering it to users. In my study of system analysis and design, I have come to appreciate several concepts that I have learnt throughout the course. More than anything else the system analysis is a creative activity. The analyst must frame the whole such that it can be analyzed. The analysis must work with all levels of an organization, data, work progress, gathering information through a host of sources, and somehow shape these into a cogent whole and the rest of the document describes in broad strokes how to frame any system, how to harness these to create the documents necessary for implementing a new plan. The analyst must be aware of the organization from the abstract level (e.g., the mission statement), to the data and technical level, the ... Get more on HelpWriting.net ...
  • 71.
    Client Technology TrackingSystem Essays Client Technology Tracking System (CTTS) System Analysis and Design [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] 2011 Client Technology Tracking System (CTTS) System Analysis and Design [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] 2011 Table of Contents Executive Summary 2 Company Overview 3 Section 1: Methods and Procedure 5 Methods 5 The ... Show more content on Helpwriting.net ... This kind of situation seems to happen almost every day. Anna suggests a company wide database that would store this kind of information. (Exhibit A–1) * Meeting between Anna Kelly (analyst/programmer), Kathy Grey (receptionist/bookkeeper), Doug Drake (system integrator), and Ben Logan (IT consultant). * How things are currently handled at the company are covered. (Exhibit A–2) For illustrating the results of the fact finding and problem formulation we used Problem Statements matrices, Problems, Opportunities, Objectives, and Constraints Matrices etc. For the analysis and design of the new system, we used DFDs (context diagram, diagram 0), use case diagram and use case narratives, ERD and interface design. The DFDs and ERD diagram are designed using Microsoft Visio 2007, and the interfaces are designed using visual studio 2008. * Problem Statement Matrix * * Problems, Opportunities, Objectives, Constraints Matrix * Cause and effect analysis is a technique in which problems are studied to determine their cause and effects * Use–Case Glossary * List of Use–Cases 1. Use Case – A behaviorally related sequence of steps (scenario), both automated and manual, for the purpose of completing a single business task. Description of system functions from the perspective of external users in terminology they understand.
  • 72.
    * Use–Case Model ...Get more on HelpWriting.net ...
  • 74.
    A Report onProcess Modeling for Web-Based Customer... Introduction This report based on a Process Modeling for Web–Based Customer Relationship Management System. It is a business requirement analysis stage in a software development life cycle. This report describes about the problem in given case study and it gives the decision making for that problems. 1.1 Customer relationship management Customer relationship management (CRM) is a most essential part in the modern business world. Customer relationship management may be a process or methodology. The CRM concerns understand about customer's needs and their behaviors in order to grow the business to leading more in competitive business world and better service for the customers (Chic McSherry). It helps to learn about customers, company's sales, and service issues. The CRM helps to a business in this ways, To give better customer service To increase customer income To identify, acquire and retain new customers To simplify marking and sales processes To control workflow and documentation procedures (Ellen Gifford (2002)). 1.2 Data Flow Diagram (DFD) Structuring the requirement is developed after the requirement analysis. The structuring the requirement means graphically represents the data process what captured in requirement analysis. Data–flow diagram is graphical tool, which shows how a data flow occur in a system. It consider like from where the data comes and where it goes and where the data are stored. Usually the graphical representation begins with ... Get more on HelpWriting.net ...
  • 76.
    School Management System SCHOOLMANAGEMENT SYSTEM PROJECT REPORT By– PRAVEEN SHEKHAR PANKAJ PANDEY PUNEET KUSHWAHA NEERAJ CHAUDHARY Under Able Guidance of– Mr. S.S. Soam Department of Computer Science & Engineering Institute of Engineering & Technology, Lucknow Institute of Engineering & Technology Lucknow Abstract We propose a system that shall enable a SCHOOL MANAGEMENT SYASTEM interfaced with a computer to be managed remotely using personal computers. A client running on the user's computer would connect to a central server, over an Internet connection. The user could then use a HTTP protocol from a personal computer to connect to the central server, and issue requests for borrowing books. In this report we describe a system – the web enabled software that ... Show more content on Helpwriting.net ... When people have a good connectivity at their disposal, with tremendous power of distributed computing to supplement the same, we can think of "connecting their personal computers to the real world applications of managing school or any institute". With this, people would be able to connect and disconnect, and manage the handling of school at their home even from a distant place. One of the very basic examples of a utility of this is – there is no old file system now,every task is now online. Students can deposit their school fees online now either by credit/debit cards or by internet banking via bank gateway.Student registration will be online,Hostel allotment,Mess bills,Libray management will all come under this. 1.1 Few Terms This Project is a web application developed for managing Institute of Engineering & Technology. This project will work as an interface between the students and faculty members of the college . It will be able to keep the records of all the students, their attendances,salaries of faculty members,mess bills of students,data about hostels, and will allow them to register themselves on our site to seek for the study materials from library even. This Project chiefly focuses on: School: A school is a collection of students,faculties, information, sources, resources, and services: it is organized for use and maintained by a public body, an institution, or a private individual. The School Management System: School ... Get more on HelpWriting.net ...
  • 78.
    Sysyem Lovely Professional University,Punjab Course Code CSE312 Course Category Course Title SYSTEM ANALYSIS AND DESIGN Courses with conceptual focus Course Planner 14810::Jagwinder Kaur Lectures 3.0 Tutorials Practicals Credits 0.0 0.0 3.0 TextBooks Sr No T–1 Title Analysis and Design of Information Systems Reference Books Sr No R– 1 Other Reading Sr No OR–1 OR–2 OR–3 OR–4 OR–5 OR–6 OR–7 OR–8 OR–9 OR–10 OR–11 OR–12 OR–13 OR–14 OR–15 OR–16 OR–17 Journals articles as Compulsary reading (specific articles, complete reference) http://vceit.com/infodata/index.htm , http://www.scribd.com/doc/9657422/Transaction–Processing–System–TPS , http://www.cisjournal.org/archive/vol2no1/vol2no1_1.pdf , http://www.albany.edu/acc/courses/fall97/acc681/ch7.html ... Show more content on Helpwriting.net ... tion To Information Systems Development(System Development Strategies–system development life cycle method, structured analysis development method, systems prototyping method) Managing The Application Development Portfolio (Information system Planningreason for initiating Information System projects, sources of project request–government agencies, department managers, senior executives, system analysts.) Managing The Application Development Portfolio(Managing project review & Selectionsteering committee method, information systems committee method, User–groups Committee Methods.) Managing The Application Development Portfolio(Project development strategy selectioninstitutional, end user development, applications for end user.) Analysis Phase(Feasibility Study, feasibility considerations, steps in feasibility analysis) T–1:ch 1 OR–4 OR–5 OR–6 explain each system development strategy the knowledge to select slide show the best methods for data input, file storage and access, processing , and output for a given situation describe the role of slide show general managers in the evaluation of information system opportunities Week 2
  • 79.
    Lecture 4 T–1:ch 2 informationsystem planning Lecture 5 T–1:ch 2 OR–3 discuss various committee methods write a system project request case study of Sevco industries profile Lecture 6 T–1:ch 2 OR–3 how institutional and end user develpoment strategies differs and where to use them decide whether ... Get more on HelpWriting.net ...
  • 81.
    Summer Training ProjectReport On Book Store Management... AMITY UNIVERSITY SUMMER TRAINING PROJECT REPORT ON BOOK STORE MANAGEMENT SYSTEM SUBMITTED BY: PARNAY TYAGI ENROLLMENT NO. A1049513014 PROJECTGUIDE: Dr. Dolly Sharma Acknowledgement I am thankful to everyone who supported me for the completion of my project on time. It is my profound privilege and pleasure to express the over whelming sense of gratitude , devotion and regards to my project guide "Dr. Dolly Sharma" for her valuable suggestions, timely guidance and words of encouragement during the project word. Without her co–operation this project would not have been in the form as it is today. Also I am very grateful to "teachers",for their kind support and guidance for the accomplishment of this project work. Parnay Tyagi Roll No.:A1049513014 Course :BCA+MCA(DUAL) CERTIFICATE This to to certify that this is a bonafied record of the project work done satisfactorily on the title "BOOK STORE MANAGEMENT SYSTEM" in "C" LANGUAGE by Parnay Tyagi, Enrollment no. A1049513014 in the partial fulfillment of BCA+MCA(DUAL). Project guide name Dr. Dolly Sharma INTRODUCTION Today the world has become technosavy and everything is automated. Automation reduces manual work and saves time. BOOK STORE MANAGEMENT SYSTEM is one that offers many flexible and convenient features allowing librarians and library users to maximize time and efficiency. The aim is to reduce the manual work of keeping the track of all the books from time to time and ... Get more on HelpWriting.net ...
  • 83.
    Documentation of ExaminationSystem Entrance Examination System Documentation Members: John Paul Conde John Mark Monilla Jocel Floirendo Sebastian Barot Kenneil Khong Hun Table of Contents Chapter 1 – Basic Planning Phase 1.1 Background of the Company 1.2 Project Study Definition & Description 1.2.1 Description of the Study 1.2.2 Policies Related to the Study 1.2.3 Definition of Terms 1.3 Scope & Limitation of the Study 1.4 Task & Duration of the Study 1.5 Duties & Responsibilities of the Personnel Involved Chapter 2 – System Analysis Phase 2.1 Data Gathering Techniques 2.2 Analysis Tools 2.2.1 Context Diagram 2.2.2 Data Flow Diagram 2.3 Problem Analysis 2.4 Description of the Properties System 2.5 ... Show more content on Helpwriting.net ... User – It refers to a person using an information system. Username – It refers to an identifier of a user. Visual Basic(VB) – It refers to a software used of any programmer in developing a system. 1.3 Scope & Limitation of the Study Entrance Examination System focuses on the examinees and its result is automatically computed once the student is done on answering the questionnaires. It has an Admission and Proctor in order to control and maintain the questionnaires and results of the Entrance Examination System. The students can print the result once the process of their examination has been done. Entrance Examination System has: Login Form – For security information. Admin Form – Main control of the system. Student/User Form – For the students who will taking up an exam. Examination Form – For the examination process of the system. Limitation of the Study: The Entrance Examination System focuses only on a highschool graduate student and the system is not an online program. 1.4 Task & Duration of the Study
  • 84.
    1.5 Duties &Responsibilities of the Personnel Involved There are 5 members are involved on this system: John Paul Conde John Mark Monilla Sebastian Barot Jocel Floirendo Kennel Khong Hun John Paul Conde and Kenneil Khong Hun are responsible for the documentation process, John Mark Monilla as the lead programmer Jocel Floirendo and Sebastian Barot are responsible for the design of the program. Chapter ... Get more on HelpWriting.net ...
  • 86.
    Hotel Management SystemEssay Major System Features and Functions The system will automate many of the manual procedures that are being used by management, front desk, and room services at the Hotel Computer Science. After preliminary analysis of the requirement specifications a system with the following functions will best satisfy the needs of the hotel management and staff. Hotel Management System Overview The following level one data flow diagram characterizes the types of inputs and outputs and the interactions that the staff may expect from the hotel reservation system. Level One Data Flow Diagram Breakdown of the System Modules A more detailed analysis of the modules that will be involved in creating a functional hotel management system reveals the need to ... Show more content on Helpwriting.net ... The front desk will have access to create, delete, edit current bills, and registration forms of customers. Also take and post messages for customers. The kitchen staff will have access to edit room service order forms, special requirements and will be able to have read access to menus. Data Structures & Algorithms Our decision to implement the Hotel Management system using standard PC technology and a commercial database product has narrowed our choices of implementation algorithms and data structures. We have chosen to implement this system with a PC database program (Access) that uses a relational data model. Basically what this means is that related data is grouped together in what can be logically viewed as a columnar table of records. Each record within a particular table is composed of a number of fields that hold the relevant information. Each record can be uniquely described by on or more fields in the record. These fields are refered to as the records primary key. Information is retrieved from the table by specifying the records primary key. The entire system is made up on a number of tables, each of which can be thought of as describing one logical entity. For example a custmomer is represented by a table that has field entries corresponding to the customers name, address and so on. Information about each customer is retrieved by specifying the customers name which is the primary key for the customer table. With this basic inforamton ... Get more on HelpWriting.net ...