Skip to content

Conversation

P1llus
Copy link
Member

@P1llus P1llus commented Jun 8, 2021

What does this PR do?

Updates package ECS version to 1.10.
Sync module changes to packages if any.
Adds Preserve Raw event functionality if not already exists.
Adds pipeline tests if missing.
Adds missing tags + moving tags to advanced settings.
Adds possibility to add custom processors.

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
  • I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
  • If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

Related issues

@elasticmachine
Copy link

Pinging @elastic/security-external-integrations (Team:Security-External Integrations)

@elasticmachine
Copy link

elasticmachine commented Jun 8, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Branch indexing

  • Start Time: 2021-06-11T22:28:25.833+0000

  • Duration: 23 min 38 sec

  • Commit: 1c39dc9

Test stats 🧪

Test Results
Failed 0
Passed 13
Skipped 0
Total 13

Trends 🧪

Image of Build Times

Image of Tests

@P1llus P1llus merged commit aeb3a3c into elastic:master Jun 14, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

3 participants