Skip to content

Conversation

@P1llus
Copy link
Member

@P1llus P1llus commented Jun 1, 2021

What does this PR do?

Updates package ECS version to 1.10.
Sync module changes to packages if any.
Adds Preserve Raw event functionality if not already exists.
Adds pipeline tests if missing.

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
  • I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
  • If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

Related issues

@elasticmachine
Copy link

elasticmachine commented Jun 1, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Pull request #1046 updated

  • Start Time: 2021-06-09T10:58:37.629+0000

  • Duration: 20 min 10 sec

  • Commit: 2e0b383

Test stats 🧪

Test Results
Failed 0
Passed 45
Skipped 0
Total 45

Trends 🧪

Image of Build Times

Image of Tests

@P1llus P1llus marked this pull request as ready for review June 7, 2021 11:09
@elasticmachine
Copy link

Pinging @elastic/security-external-integrations (Team:Security-External Integrations)

@P1llus P1llus merged commit 984858e into elastic:master Jun 9, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

3 participants