Skip to content

Conversation

@airbyteio
Copy link
Collaborator

@airbyteio airbyteio commented May 3, 2025

Update source-google-calendar

This PR was autogenerated by running airbyte-ci connectors --name=source-google-calendar up_to_date --pull

We've set the auto-merge label on it, so it will be automatically merged if the CI pipelines pass.
If you don't want to merge it automatically, please remove the auto-merge label.
Please reach out to the Airbyte Connector Tooling team if you have any questions or concerns.

Operations

  • Upgrade the base image to the latest version in metadata.yaml: Successful

  • PATCH bump source-google-calendar version to 0.0.11: Successful

  • Build source-google-calendar docker image for platform(s) linux/amd64, linux/arm64: Successful

  • Get dependency updates: Successful

  • Create or update pull request on Airbyte repository: Successful

  • Add changelog entry: Successful

Dependency updates

We use syft to generate a SBOM for the latest connector version and the one from the PR.
It allows us to spot the dependencies that have been updated at all levels and for all types of dependencies (system, python, java etc.).
Here are the dependencies that have been updated compared to airbyte/source-google-calendar:latest.
Keep in mind that :latest does not always match the connector code on the main branch.
It is the latest released connector image when the head commit of this branch was created.

Type Name State Previous Version New Version
python airbyte-cdk updated 6.46.1 6.48.10
python joblib updated 1.4.2 1.5.0
@vercel
Copy link

vercel bot commented May 3, 2025

The latest updates on your projects. Learn more about Vercel for Git ↗︎

Name Status Preview Comments Updated (UTC)
airbyte-docs ✅ Ready (Inspect) Visit Preview 💬 Add feedback May 10, 2025 4:07pm
@CLAassistant
Copy link

CLA assistant check
Thank you for your submission! We really appreciate it. Like many open source projects, we ask that you sign our Contributor License Agreement before we can accept your contribution.
You have signed the CLA already but the status is still pending? Let us recheck it.

@airbyteio airbyteio force-pushed the up-to-date/source-google-calendar branch from e61823a to 0b1b81c Compare May 3, 2025 12:48
@airbyteio airbyteio force-pushed the up-to-date/source-google-calendar branch from 0b1b81c to d54cb8f Compare May 10, 2025 13:32
@airbyteio airbyteio changed the title 🐙 source-google-calendar: run up-to-date pipeline [2025-05-03] 🐙 source-google-calendar: run up-to-date pipeline [2025-05-10] May 10, 2025
PATCH bump source-google-calendar version to 0.0.11 Build source-google-calendar docker image for platform(s) linux/amd64, linux/arm64 Get dependency updates Create or update pull request on Airbyte repository Add changelog entry
@airbyteio airbyteio force-pushed the up-to-date/source-google-calendar branch from d54cb8f to 149c92f Compare May 10, 2025 13:36
@github-actions
Copy link
Contributor

source-google-calendar Connector Test Results

0 tests   0 ✅  0s ⏱️
0 suites  0 💤
0 files    0 ❌

Results for commit 149c92f.

@airbyteio airbyteio merged commit 08576b7 into master May 10, 2025
32 of 35 checks passed
@airbyteio airbyteio deleted the up-to-date/source-google-calendar branch May 10, 2025 16:14
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment