Skip to content

Conversation

@drbergman
Copy link
Collaborator

for a brief second, studio was parsing cycle durations into rates and back, truncating to 5 decimals at each step. studio no longer double-converts cycle durations.
the template project was updated to 1.14.1 in this window and the cycle durations go weird decimals. This restores them

for a brief second, studio was parsing cycle durations into rates and back, truncating to 5 decimals at each step. studio no longer double-converts cycle durations. the template project was updated to 1.14.1 in this window and the cycle durations go weird decimals. This restores them
@drbergman drbergman assigned drbergman and rheiland and unassigned drbergman Jan 14, 2025
@rheiland
Copy link
Collaborator

Good catch! PR looks good and should hopefully pass tests once #345 is merged.

@MathCancer MathCancer merged commit d81b4f5 into MathCancer:development Jan 20, 2025
96 of 104 checks passed
@drbergman drbergman deleted the reround-sample-project-cycle-durations branch January 21, 2025 00:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

3 participants