The document provides an introduction to software engineering, highlighting its definition, challenges, and development processes. It discusses the distinction between computer science and software engineering, emphasizes the need for responsibility in software development, and outlines various software development practices. The document also addresses the difficulties in creating software, such as changing requirements and schedule pressures.
Software: A definition “SoftwareSystems are perhaps the most intricate and complex … of the things humanity makes.” -Fred Brooks
5.
Software engineering • Hasprogressed very far in a short time: – 50 years ago, most programming were done by Scientists trying to solve mathematical problems. – Today, we build monstrous systems used everywhere. • But, software industry is in crisis: – A software project overshoots its schedule by a half. – Three quarters of all large systems are operating failures.
6.
Computer Science: Adefinition “Computer science is a discipline that involves the understanding and design of computers and computational processes. In its most general form it is concerned with the understanding of information transfer and transformation. Particular interest is placed on making processes efficient and endowing them with some form of intelligence.” -CSAB
7.
Engineering: A definition “Thesystematic and regular application of scientific and mathematical knowledge to the design, construction, and operation of machines, systems, and so on of practical use and, hence, of economic value. Particular characteristic of engineers is that they take seriously their responsibility for correctness, suitability, and safety of the results of their efforts. In this regard they consider themselves to be responsible to their customer (including their employers where relevant), to the users of their machines and systems, and to the public at large.” -Robert Baber
8.
Software Engineering asEngineering • Practical use, economic value: – We need to determine the content and build the best product value. • Responsibility for correctness, suitability and safety: – The work you do could impact the safety, business and well being of the customer. • Regular application of scientific and mathematical knowledge: – Computer Science, psychology, economics and management
9.
Software Engineering: ADefinition “Software engineering is the application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software; that is, the application of engineering to software” -IEEE
Software Development Practices •You will learn MANY software development practices. • You’ll find: – A practice is good for safety-critical software. – Another is better for small projects. • Engineering is about selecting the most appropriate method for a set of circumstances. • You can use the practices and build a software process with them.
13.
Software Development Process Theprocess by which user needs are translated into a software product. The process involves translating user needs into software requirements, transforming the software requirements into design, implementing the design in code, testing the code, and sometimes installing and checking out the software for operational use. Note: these activities might overlap or be performed iteratively - IEEE
14.
Software process model PlanDriven The cost can be minimized by creating detailed plans and by constructing and inspecting architecture and design documents. Agile Time is spent planning and gathering requirements for small iterations throughout the entire lifecycle of the project.
The programmer The programmer,like the poet, works only slightly removed from pure thought-stuff. He builds his castles in the air, from air, creating by exertion of the imagination. -Frederick Brooks
17.
Software Engineering Challenges •Tractable Medium – The constraints of physical medium can serve to simplify alternatives. • Changing requirements – It is hard for customers to express what they want in a product. • Schedule Optimism – We are an optimistic crew. • Schedule Pressure – Every product is late before it’s even started
18.
Credits Based on:A (Partial) Introductionto Software Engineering Practices and Methods • By Laurie Williams • Available in: http://agile.csc.ncsu .edu/SEMaterials/C oursePack.pdf