外墙保温网格布施工工艺是怎样的?它真的能有效保温吗?
The construction process of exterior wall thermal insulation mesh fabric is divided into four steps: substrate treatment, mesh fabric pasting, coating of waterproof layer, and finish coating.
The first step is substrate treatment, which involves cleaning the wall and repairing cracks to ensure the wall is smooth.
The second step is to paste the mesh fabric on the wall and fix it with glue or nails.
The third step is to coat the waterproof layer to protect the mesh fabric from water erosion.
Finally, the finish coating is applied to complete the construction of exterior wall thermal insulation mesh fabric. The entire process requires professional construction personnel and equipment to ensure the construction quality and effect.