权威指南:保温网格布施工方法及其在建筑外保温中的重要性
保温网格布施工方法详解
Detailed Construction Methods of Thermal Insulation Grid Cloth
1. 基层处理
1. Base Layer Treatment
施工前需等待保温层完全施工到位,约一天后进行。先进行墙体抹灰,局部不平整超限度部位用1:2水泥砂浆找平。
Before construction, wait for the insulation layer to be completely in place (about one day). First apply wall plastering, and use 1:2 cement mortar to level areas exceeding flatness limits.
2. 聚合物砂浆处理
2. Polymer Mortar Treatment
检查保温层是否完全干燥,干燥后刷聚合物砂浆以抗裂,刮涂面积应超过网格布长和宽,厚度均匀。
Check if the insulation layer is completely dry. After drying, apply polymer mortar for crack resistance, with coating area exceeding the grid cloth dimensions and uniform thickness.
3. 基准线定位
3. Benchmark Positioning
根据建筑设计和外墙外保温技术要求,在墙面弹出外门窗水平、垂直控制线。挂基准线控制聚苯板的垂直度和平整度。
According to architectural design and external wall insulation requirements, mark horizontal/vertical control lines for doors/windows. Hang reference lines to control EPS board verticality and flatness.
网格布施工关键步骤
Key Steps in Grid Cloth Construction
1. 将网格布压入槽内,确保无明显网格布露出
1. Press the grid cloth into grooves ensuring no obvious exposure
2. 门窗洞口周边做翻包处理,保持甩出部分网布清洁
2. Apply wrapping treatment around openings, keeping exposed grid clean
3. 阴角处加盖200mm长标准网,贴在最外侧
3. Add 200mm standard grid at inner corners, applied outermost
4. 埋入深度约1mm,不允许太深
4. Embedding depth about 1mm (not deeper)
后期养护要点
Post-Construction Maintenance
• 施工后需养护一段时间
• Requires curing period after construction
• 定期检查褶皱、起翘等问题
• Regularly check for wrinkles/lifting issues
• 做好门窗防雨水冲刷措施
• Implement rain protection for doors/windows
保温网格布的核心作用
Core Functions of Insulation Grid Cloth
1. 增强性能:防止外墙开裂,提升结构强度
1. Reinforcement: Prevents wall cracking, enhances structural strength
2. 耐久特性:铂金玻纤基材,耐碱性能优异
2. Durability: Platinum fiberglass base with excellent alkali resistance
3. 经济优势:节省砂浆用量,降低综合成本
3. Cost Efficiency: Reduces mortar usage and overall costs
4. 规格选择:外墙保温推荐3x3x45克,颗粒用5x5x160克
4. Specifications: 3x3x45g for walls, 5x5x160g for particles
SEO优化提示:本文详细解析了保温网格布的标准施工流程和技术要点,包含8大关键步骤和4大核心功能,适用于建筑外墙保温工程技术人员参考。
SEO Tip: This article details standard construction procedures and technical points of insulation grid cloth, covering 8 key steps and 4 core functions, suitable for building exterior insulation professionals.