DEV Community

Cover image for How Downtime Impacts SEO (and How to Build a Website Uptime Monitor with Google Sheets)
Elvis Ansima
Elvis Ansima

Posted on

How Downtime Impacts SEO (and How to Build a Website Uptime Monitor with Google Sheets)

Typically, we have dozens of sites we have deployed on the Internet, but things can happen that cause the site to go down, e.g. you experience a DDOS attack, the server encountered a bug and stopped working, your last deployment crashed the production site, etc...
Downtimes aren't just inconvenience - it's a potential disaster. Even a short downtime can affect your search engine rankings, frustrate users, and cost you traffic and therefore your revenue. In this blog, we'll explore how downtime can impact SEO and how you can build a simple uptime monitoring tool using Google Sheets and Google Apps Script.

If you’re short on time, you can skip the DIY setup and grab a ready-to-use template here.

Why Does Downtime Affect SEO?

Search engines like Google prioritize reliable websites & services. When your site is unavailable, Search engine are "discouraged" from pushing your site upfront, it signals to search engines that your site may not be reliable. Here’s how downtime impacts your SEO:

1. Crawling Issues

Search engines use bots to crawl your website periodically. If your site is down during a crawl, the bot may fail to index your pages, leading to:

  • Missed opportunities for ranking updates.
  • Pages being temporarily deindexed if repeated downtime occurs.

2. User Experience

When users encounter a site that won’t load or load slowly, they leave it and fast and this can lead to:

  • Increased bounce rates.
  • Lower retention rate. Both are negative signals for search engines, which may reduce your rankings.

3. Lost Backlinks and Traffic

If downtime occurs frequently, people linking to your site might lose trust and remove your links. This loss of backlinks directly affects your domain authority and organic rankings.

4. Competitor Advantage

During downtime, users will search for alternatives and often ending up on competitor websites. Over time, this traffic shift can strengthen your competitors’ SEO position.

How to Build a Website Uptime Monitor

Step 1: Set Up the Spreadsheet

  1. Open a new Google Sheet.
  2. Create columns labeled:

    • Website URL
    • Status
    • Last Checked Spread sheet
  3. Add the URLs of the websites you want to monitor under the “Website URL” column.

Step 2: Get to Know Apps Script

Apps Script is Google’s scripting platform for automating tasks in Google Workspace. It’s simple to learn and perfect for creating an uptime monitor.

  1. Go to Extensions > Apps Script in the Google Sheets menu. Apps script

  2. Familiarize yourself with the editor and basic commands like accessing sheet data and sending emails.

Step 3: Create a Bare Minimum Uptime Monitor

  1. Copy and paste the following script into the Apps Script editor:
function checkUptime() { var sheet = SpreadsheetApp.getActiveSpreadsheet().getActiveSheet(); var data = sheet.getDataRange().getValues(); for (var i = 1; i < data.length; i++) { var url = data[i][0]; if (url) { try { var response = UrlFetchApp.fetch(url, {muteHttpExceptions: true}); var status = response.getResponseCode(); sheet.getRange(i + 1, 2).setValue(status === 200 ? "Up" : "Down"); } catch (e) { sheet.getRange(i + 1, 2).setValue("Down"); } sheet.getRange(i + 1, 3).setValue(new Date()); } } } 
Enter fullscreen mode Exit fullscreen mode
  1. Save the script and run it to check the status of your websites. Run Apps script function An authorization popup will surely come in, please authorize the app, you will see the unsafe notice, just click continue Authorization flow After that, if you go back to the spreadsheet, you will see new entries Updated spreadsheet

Step 4: Deploy a Web App with Your Favorite JS Libraries

To make your uptime monitor more visually appealing, you can incorporate JavaScript libraries and frameworks as follows:

  1. Create index.html file
    index.html file

  2. Set Up Chart.js for Graphs:

  3. Include the Chart.js library in your index.html file by adding this script tag: <script src="https://cdn.jsdelivr.net/npm/chart.js"></script> just like you would have done in a regular html file.

  4. Use the following example to display uptime data as a bar chart:

 <canvas id="uptimeChart"></canvas> <script> const ctx = document.getElementById('uptimeChart').getContext('2d'); const chart = new Chart(ctx, { type: 'bar', data: { labels: ['Site 1', 'Site 2', 'Site 3'], datasets: [{ label: 'Uptime Status', data: [95, 85, 100], // Example data backgroundColor: ['#4CAF50', '#FF9800', '#F44336'], }] }, options: { responsive: true, scales: { y: { beginAtZero: true } } } }); </script> 
Enter fullscreen mode Exit fullscreen mode
  1. Add Styling with Tailwind:

    • Include Tailwind CSS in your project using a CDN: <script src='https://cdn.tailwindcss.com'></script>.
    • Create a visually appealing layout using Tailwind classes. For example:
     <div class="flex justify-center items-center bg-gray-100 min-h-screen"> <div class="p-4 bg-white rounded shadow"> <h1 class="text-xl font-bold mb-4">Uptime Monitor</h1> <canvas id="uptimeChart"></canvas> </div> </div> 
  2. Deploy as a Google Web App:

    • In the Apps Script editor, create a doGet function to serve the HTML:
     function doGet() { return HtmlService.createHtmlOutputFromFile('index'); } 
  • Click on Deploy > New Deployment > Web App and configure access settings (e.g., anyone with the link). Deployment
    1. Fetch Data from the Spreadsheet:
  • In your index.html file, use Google Apps Script to pass data to the client-side JavaScript:

     function getData() { const sheet = SpreadsheetApp.getActiveSpreadsheet().getActiveSheet(); const data = sheet.getDataRange().getValues(); return data; } 
    • Fetch this data in your index.html using google.script.run.getData and integrate it into your Chart.js configuration or display it in a table.

Step 5: Go Further with a Ready Template

Want to skip the setup process? Grab a pre-built template that includes:

  • Automated monitoring and email alerts.
  • A pre-designed dashboard with uptime stats.
  • Collect users feedback
  • Instructions for customization.

My Own monitoring status page
Get the template here.

Next Steps

Once your uptime monitor is up and running you can push the boundaries and :

  1. Add triggers to automatically run periodic checks
  2. Integrate webhooks to send alerts to tools like Slack, Discord, Telegram, etc..
  3. Monitor additional metrics, such as response time.
  4. Manipulate your data to see insights in the charts

With these steps, you’ll ensure you , protect your SEO, and keep your users happy. Start monitoring today and take control of your site’s performance!

Top comments (0)